• I V <br /> Everett Museum of History Structural Assessment November <br /> CG Project No. 17390.10 Page 2 of 5 V <br /> interior brick wall on grid B.A new steel header with steel posts was constructed to reinforce the opening.The <br /> 1988 drawings show a portion of the original basement between grids B and E that extends below the sidewalk <br /> on Colby Avenue.This area is now closed off, but drawings were not available showing this construction. <br /> In 2001,the building was converted to a data center. As part of this remodel,several new mechanical units <br /> were on top of the roof structure, a large opening was framed into the roof and floor framing to accommodate <br /> a generator intake/exhaust system,and approximately 3000sf of a new 4" concrete topping slab was poured <br /> over top of the existing floor framing to support a new switch equipment room.The floor area under the <br /> concrete topping slab was reinforced by adding(13) new wood posts and footings in the basement.Several new <br /> wood shearwalls were added in the basement under the perimeter of the concrete topping slab in order to <br /> support seismic forces from heavy floor system. <br /> CHANGE OF OCCUPANCY <br /> Chapter 10 of the IEBC applies to existing buildings where a change of occupancy occurs. Since the existing <br /> occupancy classification is Business group B and the proposed occupancy classification is Assembly group A-3, <br /> the provisions of IEBC Sections 1002 through 1012 shall apply. We have evaluated the existing building per <br /> these sections and the following is a summary of the impacts to the gravity and lateral systems. <br /> Section 1007.1 states that buildings or portions thereof subject to a change of occupancy where such <br /> change in the nature of occupancy results in higher uniform or concentrated loads based on Table 1607.1 <br /> of the IBC shall comply the gravity load provisions of the IBC. Per the 2001 drawings,the live loads used to <br /> evaluate the floor framing were 70 psf(50psf+20psf partition loads)at the office areas, 125psf at the <br /> switch room,and 100psf at corridors and stairs.The proposed main floor plan shows office areas,corridor <br /> and stairs, a main gallery, a small gallery and a café space.The required live load for the galleries and café <br /> space is 100psf and these spaces are shown where some of the current office space is located.The floor <br /> framing under the areas that are changing from office space to gallery or café space require analysis and <br /> may likely require upgrades.The floor framing under the switch room is already designed for a higher live <br /> load than 100psf,so no analysis of this area is required. <br /> Section 1007.2 states that buildings and structures subject to a change of occupancy where such change in <br /> the nature of occupancy results in higher wind or snow risk categories based on Table 1604.5 of the IBC, <br /> shall be analyzed and shall comply with the applicable wind or snow load provisions of the IBC. Both the <br /> current risk category and the proposed risk category are II per Table 1604.5 of the IBC. No further analysis <br /> is required for wind and snow loads. <br /> Section 1007.3.1 states that where a building or portion thereof is subject to a change of occupancy that <br /> results in the building being assigned to a higher risk category based on Table 1604.5 of the IBC, the <br /> building shall comply with the requirements for IBC-code level seismic forces as specified in Section <br /> 301.1.4.1 for the new risk category. Both the current risk category and the proposed risk category are II <br /> per Table 1604.5 of the IBC. No further analysis is required for seismic loads. <br /> UPGRADES REQUIRED FOR PROPOSED TENNANT IMPROVEMENTS <br /> In addition to the possible upgrades of the gravity framing mentioned in the Change of Occupancy section <br /> above,there are required upgrades to the gravity and lateral framing due to the proposed floor plans.The <br /> floor plans provided by Capital Architects Group show the removal of several columns at the main floor and <br /> basement levels. New beams will be required to support the roof and floor framing in these areas. Also, <br /> adjacent columns and footings may require upgrades to support increased roof and floor loads.At the <br />