Laserfiche WebLink
Describe drainage flow paths (direction, location): <br />The project site is relatively flat with curb around the perimeter of the project site. There <br />is currently a 361n. concrete stormwater pipe underneath the playground, that will not <br />be impacted by this project. This storm pipe discharges water into Silver Lake. <br />Are there Critical Areas? What are they and where are they located relative to your project?: <br />There are no known critical areas near the project. <br />Task 2: Describe proposed project <br />Describe your proposed project: <br />The City of Everett proposes to replace the playground equipment for 2-5 and 5-12 <br />year olds along with new Foreverl-awn synthetic turf or similar artificial turf products. <br />How will your project change the existing condition?: <br />The project will not be changing the existing conditions from a hydrologic or hydraulic <br />perspective. <br />Describe roofs, patios, driveways, or structures added: <br />There are no proposed roofs, patios, or driveways. The only structures proposed are <br />likely hard play structures over permeable artificial turf. All surfacing is considered <br />pervious. <br />How will stormwater be managed?: <br />The project does not trigger MR 6 or MR 7 and SW BMPs (MR 5) are infeasible. Six <br />inches of sand will be provided underneath the turf with the intention of providing basic <br />treatment by mimicking the design criteria for Permeable Pavements. No treatment is <br />required, no such design criteria exists for turf, thus no treatment is claimed. <br />Describe how the project will affect existing drainage systems onsite or on adjacent properties <br />or both: <br />The project will not affect existing drainage systems onsite or on adjacent properties. <br />The project will consist of replacing the existing playground mulch surfacing with a <br />synthetic turf. <br />City of Everett Public Works <br />Small Project Stimunimer Sue Plan Report Dec 2019 <br />