My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reid Middleton 9/8/2023
>
Contracts
>
6 Years Then Destroy
>
2023
>
Reid Middleton 9/8/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2023 3:08:51 PM
Creation date
9/12/2023 3:08:13 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reid Middleton
Approval Date
9/8/2023
End Date
12/31/2023
Department
Parks
Department Project Manager
Brad Chenoweth
Subject / Project Title
Condition Report for three existing Floats
Tracking Number
0003924
Total Compensation
$28,100.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Brad Chenoweth <br />City of Everett Parks & Facilities <br />August 25, 2023 <br />File No. 242022.913.026 <br />Page 3 <br /> <br /> <br />• Rough Order Magnitude opinion of probable construction cost for each <br />option, including utilities (potable water, fire protection, and electrical). <br />• PDF sketch of proposed layout (plan view) for each option. <br /> <br />4. Report & Concepts Schedule <br /> <br />Reid Middleton will prepare and submit the draft assessment report and concepts <br />within 3 weeks after the completion of the site assessment. Reid Middleton will <br />attend a client review meeting (virtual meeting) after the draft submittal and respond <br />to the review comments. Reid Middleton will complete and submit the final condition <br />assessment report and concepts within 2 weeks of the client’s review meeting. All <br />deliverables will be provided in PDF format. <br /> <br />Report Deliverables: <br />• Draft assessment report & concept options (letter or engineering memo type) <br />• Final assessment report & concept options (letter or engineering memo type), <br />signed and stamped by a Professional Engineer licensed by the State of <br />Washington <br /> <br />5. Additional services requested by City of Everett Parks & Facilities <br /> <br />Reid Middleton can provide additional services that are beyond the scope of services <br />described in Section B, Items 1 thru 4, at client request with contract amendment(s). <br /> <br />6. Assumptions <br /> <br />• Above water inspection is limited to the three existing floats (including guide <br />pile anchorage), gangways, and abutments at TA Sullivan Park and the single <br />pier structure at the 116th Street SE Pier. <br />• The inspection team will be granted uninhibited access to the structures for the <br />duration of the assessment. <br />• Reid Middleton will provide their own watercraft for the assessment. <br /> <br />7. Exclusions <br /> <br />• Topographic or hydrographic survey <br />• Underwater (dive) assessment or testing <br />• Destructive or partially destructive testing <br />• Development of repair or rehabilitation design documents <br />• Structural load capacity evaluation <br />• Feasibility study of environmental permitting <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.