My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TranTech, Inc. 9/11/2023
>
Contracts
>
6 Years Then Destroy
>
2024
>
TranTech, Inc. 9/11/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2023 3:14:28 PM
Creation date
9/12/2023 3:12:38 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
TranTech, Inc.
Approval Date
9/11/2023
Council Approval Date
8/30/2023
End Date
12/31/2024
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
EPIC Bridge – Type, Size and Location Study
Tracking Number
0003925
Total Compensation
$856,998.74
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett Point Industrial Center (EPIC) Bridge Project <br /> <br /> Page 12 of 28 <br /> <br />• Infiltration Screening: HWA will screen the soils and groundwater conditions for <br />infiltration potential along the project corridor. This screening will include evaluating <br />soil grain size analysis and groundwater data. No pilot infiltration testing will be <br />conducted as part of this scope of work. <br /> <br />• Slope Stabilization Design: HWA will provide design recommendations for slope <br />stabilization systems along the western steep slope. <br /> <br />• Approach Pavement Design: HWA will provide pavement design recommendations <br />for the two bridge approaches. <br /> <br />• HWA QA/QC: HWA will have all design calculations and recommendations reviewed <br />by a senior principal prior to distribution to the design team or the AGENCY. <br /> <br />• Prepare Draft Geotechnical Engineering Report: HWA will prepare a draft <br />geotechnical engineering report for the project. This report will contain the results of <br />the geotechnical engineering investigation, including a description of surface and <br />subsurface conditions; a site plan showing exploration locations and other pertinent <br />features; a summary of boring logs; and laboratory test results. The report will provide <br />geotechnical recommendations for each of the proposed improvements. <br /> <br />Deliverables: <br />• Exploration Plan <br />• Draft Geotechnical Report <br />Assumptions: <br />• All drilling spoils will be drummed and stored at the AGENCY facility until such time as <br />environmental testing results are available. Once environmental testing results are <br />available, the driller will dispose of the soil at an appropriate disposal facility. <br /> <br />• HWA assumes that they will attend 12 project coordination meetings other than the kickoff <br />meeting. All meetings are assumed to be virtual. <br /> <br />• All Field explorations will be conducted between the hours of 8 AM to 5 PM. HWA <br />assumes that the establishment of traffic control will also abide by these hours. <br /> <br />• All required rights of entry will be provided by the AGENCY or CONSULTANT at no <br />cost to HWA. <br /> <br />• The borehole locations will be surveyed by others. <br /> <br />Exhibit A
The URL can be used to link to this page
Your browser does not support the video tag.