Laserfiche WebLink
City of Everett Point Industrial Center (EPIC) Bridge Project <br /> <br /> Page 24 of 28 <br /> <br />• Provide programmatic options for open space mitigation <br /> <br />8.7 Alternatives Analysis and Report <br /> <br />• Written narratives <br />• New graphic content <br />• Reference graphic content <br />• Coordination with report lead <br /> <br />8.8 Support regulatory submissions (NEPA, etc) <br /> <br />• Inclusive of all elements to be considered <br /> <br />Deliverables: <br />• Outreach support materials –digital plans, diagrams, and 4 perspective renderings <br />• Support alternatives analysis report with written narratives, and graphics (to include plans, <br />diagrams, and perspective listed above) <br />Assumptions: <br />• Client interaction: 6 team meetings, 2 of which are in person <br />• 10 team meetings <br />• Schedule duration, assume 1-year duration for TS&L study and final report <br /> <br /> <br /> <br />Exhibit A