My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TranTech, Inc. 9/11/2023
>
Contracts
>
6 Years Then Destroy
>
2024
>
TranTech, Inc. 9/11/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2023 3:14:28 PM
Creation date
9/12/2023 3:12:38 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
TranTech, Inc.
Approval Date
9/11/2023
Council Approval Date
8/30/2023
End Date
12/31/2024
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
EPIC Bridge – Type, Size and Location Study
Tracking Number
0003925
Total Compensation
$856,998.74
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett Point Industrial Center (EPIC) Bridge Project <br /> <br /> Page 27 of 28 <br /> <br />WORK ELEMENT 10 STRUCTURAL DESIGN <br /> <br />This work element is performed by CONSULTANT to provide structural design services. <br />Based on input from the AGENCY and engineering activities associated with work elements 1 <br />through 9, CONSULTANT’s structural team will perform preliminary structural design <br />associated with up to three viable bridge alternatives. The design will follow most current <br />WSDOT Bridge Design Manual (BDM), AASHTO, and AGENCY requirements. <br /> <br />Throughout the structural design activities, special care will be given to incorporate low impact <br />design approaches like noise reduction, minimization of traffic impacts, and environmental <br />protection. <br /> <br />Bridge design activities start with a review of the gathered data provided by team members <br />including survey, geotechnical, hydrology, traffic, civil, etc. <br /> <br />Throughout preliminary structural assessment/design of the studied alternatives, we will be in <br />continuous communication with the AGENCY for consultations on parameters like structure <br />location, length and vertical clearance. Also, required roadway elevations will be addressed. <br /> <br />We will collaborate with the AGENCY and our design team to address all engineering aspects of <br />this bridge design project to optimally assess up to three viable alternatives. The team will <br />recommend one alternative that possesses the most AGENCY-desired attributes to advance to <br />full design stage based on an alternative comparison matrix that will be developed in close <br />coordination with the AGENCY. <br /> <br />All data and final products will become the property of AGENCY upon project completion. All <br />data will be provided in a mutually agreeable format. <br /> <br />Deliverables: <br />• Draft TS&L Report <br />• Final TS&L Report <br /> <br /> <br /> <br />Exhibit A
The URL can be used to link to this page
Your browser does not support the video tag.