Laserfiche WebLink
City of Everett Point Industrial Center (EPIC) Bridge Project <br /> <br /> Page 27 of 28 <br /> <br />WORK ELEMENT 10 STRUCTURAL DESIGN <br /> <br />This work element is performed by CONSULTANT to provide structural design services. <br />Based on input from the AGENCY and engineering activities associated with work elements 1 <br />through 9, CONSULTANT’s structural team will perform preliminary structural design <br />associated with up to three viable bridge alternatives. The design will follow most current <br />WSDOT Bridge Design Manual (BDM), AASHTO, and AGENCY requirements. <br /> <br />Throughout the structural design activities, special care will be given to incorporate low impact <br />design approaches like noise reduction, minimization of traffic impacts, and environmental <br />protection. <br /> <br />Bridge design activities start with a review of the gathered data provided by team members <br />including survey, geotechnical, hydrology, traffic, civil, etc. <br /> <br />Throughout preliminary structural assessment/design of the studied alternatives, we will be in <br />continuous communication with the AGENCY for consultations on parameters like structure <br />location, length and vertical clearance. Also, required roadway elevations will be addressed. <br /> <br />We will collaborate with the AGENCY and our design team to address all engineering aspects of <br />this bridge design project to optimally assess up to three viable alternatives. The team will <br />recommend one alternative that possesses the most AGENCY-desired attributes to advance to <br />full design stage based on an alternative comparison matrix that will be developed in close <br />coordination with the AGENCY. <br /> <br />All data and final products will become the property of AGENCY upon project completion. All <br />data will be provided in a mutually agreeable format. <br /> <br />Deliverables: <br />• Draft TS&L Report <br />• Final TS&L Report <br /> <br /> <br /> <br />Exhibit A