Laserfiche WebLink
City of Everett Point Industrial Center (EPIC) Bridge Project <br /> <br /> Page 28 of 28 <br /> <br />WORK ELEMENT 11 CONSTRUCTABILITY AND ESTIMATE <br /> <br />This work element is performed by Ott-Sakai & Associates (Ott-Sakai) to provide <br />constructability review and construction estimation services. This work element includes the <br />following tasks: <br /> <br />11.1 Project Management <br /> <br />1. Invoicing <br />2. Team Management and Coordination <br />3. Meetings <br /> <br />11.2 Construction and Cost Estimate <br />Providing constructability review, cost estimation, and a construction schedule on the <br />TS&L plan set <br />1. Constructability review <br />2. Cost Estimate <br />3. Construction Schedule <br /> <br />Deliverables: <br />• Constructability review report, cost estimate, and construction schedule <br />Assumptions: <br />• Plan set will be developed to the TS&L level of detail. <br />Exhibit A