My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TranTech, Inc. 9/11/2023
>
Contracts
>
6 Years Then Destroy
>
2024
>
TranTech, Inc. 9/11/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2023 3:14:28 PM
Creation date
9/12/2023 3:12:38 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
TranTech, Inc.
Approval Date
9/11/2023
Council Approval Date
8/30/2023
End Date
12/31/2024
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
EPIC Bridge – Type, Size and Location Study
Tracking Number
0003925
Total Compensation
$856,998.74
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
# <br />Exhibit - Subconsultant Cost Computation <br />3.25 <br />PrincipalDirectorSenior AssociateSr EngineerEngineer IIICivil Designer IICivle Designer !Lead Tecnical / DesigerLead Planner/MangerPlanner IIISr Environmentla ScienteistLead Environmental ScientistAccountantClericalCultural Resource Specialst IICultural Resource Specialst IITotal <br />Hours <br /> Direct Labor <br />Cost <br />Total Cost Per <br />Work Element <br />direct rate 123.68$ 102.38$ 85.00$ 67.00$ 52.00$ 45.00$ 37.50$ 55.00$ 55.07$ 52.00$ 63.21$ 54.60$ 45.15$ 35.55$ 50.51$ 41.09$ <br />Work Element 1 -Project Management 7,444.64$ 24,195.09$ <br />1.1 Monthly Progress Reports and Invoicing 12 6 18 1,074.90$ <br />1.2 Team Management and Coordination 12 24 36 3,092.15$ <br />1.3 Meetings 4 12 16 1,298.72$ <br />1.4 QA/QC 16 16 1,978.87$ <br />1.5 0 -$ <br />1.6 0 -$ <br />0 -$ <br />Work Element X - Name -$ -$ <br />X.1 TaskName1 0 -$ <br />X.2 TaskName2 0 -$ <br />X.3 TaskName3 0 -$ <br />X.4 0 -$ <br />X.5 0 -$ <br />X.6 0 -$ <br />0 -$ <br />Work Element X - Name -$ -$ <br />X.1 TaskName1 0 -$ <br />X.2 TaskName2 0 -$ <br />X.3 TaskName3 0 -$ <br />X.4 TaskName4 0 -$ <br />X.5 TaskName5 0 -$ <br />0 -$ <br />Work Element 4 - Environmental Review 10,024.27$ 32,578.89$ <br />4.1 Review Existing Documents 16 8 6 4 4 6 44 2,256.03$ <br />4.2 Filed Assessments 4 2 12 8 2 4 6 38 2,158.97$ <br />4.3 Enviromental Evaluation 6 12 40 16 6 16 96 5,609.28$ <br />0 -$ <br />0 -$ <br />0 -$ <br />Work Element 5 - Civil Engineering 33,255.51$ 108,080.42$ <br />5.1 Stormwater Analysis 9 50 98 34 14 205 9,638.00$ <br />5.2 TS&L Roadway Design 8 60 4 120 192 10,617.44$ <br />5.3 Preferred Concept 4 30 60 40 134 7,404.72$ <br />5.4 Opinion of Cost 2 8 24 34 1,863.36$ <br />5.5 Lanscape Assessement 32 4 16 52 3,732.00$ <br />0 -$ <br />Work Element 6 - Utility Coordination 2,378.72$ 7,730.83$ <br />6.1 Utility Contact and Date Collection 4 12 24 40 2,378.72$ <br />0 -$ <br />0 -$ <br />0 -$ <br />0 -$ <br />0 -$ <br />Work Element X - Name -$ -$ <br />X.1 TaskName1 0 -$ <br />City of Everett <br />Everett Point Industrial Center (EPIC) Bridge Project <br />Perteet, Inc. <br />Project multiplier: <br /># <br />Exhibit A
The URL can be used to link to this page
Your browser does not support the video tag.