My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023/09/13 Council Agenda Packet
>
Council Agenda Packets
>
2023
>
2023/09/13 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2023 11:29:33 AM
Creation date
9/14/2023 11:23:33 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/13/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
227
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Amendment 1 PSA with Brown and Caldwell for Port Gardner Storage Facility Project <br />Exhibit A Scope of Work <br />10 <br />• Coordinate with Discipline Engineering staff for design services where required. <br />• Review and provide comments on Contractor’s change order pricing. <br />Task Assumptions <br />• City’s CM will administer and manage Change Documentation, including processing change <br />orders and field orders, changed work tracking, distributing change documentation, and <br />maintaining change logs. <br />• An estimated 20 change items is assumed with engineer design labor effort of 5 hours per <br />change item. <br />• Change items number and design effort is an estimate and may not reflect actual number of <br />items or effort. CO metrics will be reviewed monthly and included in the monthly progress report. <br />• Reissuance of contract drawings is not anticipated. Contractor’s record drawings will incorporate <br />contract change designs and record information. City’s CM will check Contractor’s redline record <br />drawings include this information. <br />• BC will review and comment on change order pricing, but price negotiation for Change Orders will <br />be by City’s CM. <br />Everett Responsibilities <br />• Prepare Change Orders (COs), including processing and tracking, <br />• Review and comment on Contractor’s change order proposals content and pricing. <br />• Include executed change orders with equitable adjustment in Contractor pay requests. <br />• Provide research materials and field access to respond to change requests, as required, as <br />governed by the Contract. <br />• Host ad-hoc meetings related to change issues. <br />Meetings <br />• Allowance of up to 10, 1-hour ad-hoc meetings related to change issues. <br />Work Products <br />• Contract change design content, including sketches, photos, pdf markups and reissued Contract <br />Drawings to communicate changes to the Contract Documents. <br />Task 700 – Startup and Testing <br />Objective: Assist City’s CM with Contractor’s testing and commissioning activities. Verify results of <br />start-up tests meet performance criteria in the Contract Documents. Document start-up and testing <br />activities for construction record. <br />Activities/Approach: This task includes the following activities: <br />• Witness testing and commissioning activities, including approving procedures and results prior <br />proceeding with subsequent testing phases. <br />• Coordinate discipline engineering assistance with start-up activities when needed. <br />Task Assumptions <br />• No factory or off-site testing will be witnessed by the Engineer in the Demolition Package. <br />• Startup and testing activities are limited to temporary electrical systems in Demolition Package.
The URL can be used to link to this page
Your browser does not support the video tag.