My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023/09/20 Council Agenda Packet
>
Council Agenda Packets
>
2023
>
2023/09/20 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2023 9:07:09 AM
Creation date
9/21/2023 8:46:06 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/20/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Everett <br />3rd Ave SE Water Quality Treatment Page 12 of 14 <br /> <br />Task 5.3 Conceptual Design Report <br />The Consultant will develop a Conceptual Design Report and associated package for ECOLOGY <br />review and acceptance. <br /> <br />City of Everett’s Responsibilities <br />1. City will provide input and review comments on the draft and final Report within the <br />agreed upon schedule. <br />2. Review Conceptual Design Report prior to submittal to Ecology. <br />3. Upload Conceptual Design Report and files for Ecology review. <br /> <br />Assumptions: <br />o Design figures will be reduced to 11x17 inches in size and be legible. <br />o The Report will include a summary for each Regional Facility (up to 5) and will <br />include the following information: <br />1. Sizing of Stormwater Features - Estimate size of regional facilities for <br />treatment and flow control. <br />2. The existing conditions and recommended conceptual design strategy for <br />stormwater conveyance modifications, regional facilities, and shared spaces. <br />Identify areas where the typical strategy will be modified to address physical <br />site constraints. <br />3. Identify subsurface variation with potential impacts to the site <br />recommendations and provide a brief description of subsurface testing needed <br />to complete the design. <br />4. Design Exhibits - Concept level exhibits based available on GIS and aerial <br />data of the design strategy in both plan and schematic cross-section views. <br />5. Refine Cost Estimate – Refine the cost estimate to address any changes <br />identified during the development of the conceptual design. <br /> <br />Deliverables <br />· Draft Conceptual Design Report for City and Ecology review. <br />· Final Conceptual Design Report with a formal response to Ecology comments. <br /> <br />Task 5 Regional Stormwater Facility Plan <br /> <br />The purpose of this task is to prepare a regional Stormwater Facility Plan meeting the <br />requirements of EMC 14.28.070. <br /> <br />Task 5.1 Regional Facility Plan document <br />Prepare a document summarizing the purpose of the regional facility plan, how it was prepared <br />and how it should be implemented. This can draw on the study, but needs to be the document
The URL can be used to link to this page
Your browser does not support the video tag.