My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Brown and Caldwell, Inc. 9/20/2023
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Brown and Caldwell, Inc. 9/20/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2026 3:27:40 PM
Creation date
9/22/2023 10:04:49 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Brown and Caldwell, Inc.
Approval Date
9/20/2023
Council Approval Date
9/13/2023
End Date
12/31/2027
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF WMVD Storm and Combined Sewer
Tracking Number
0003935
Total Compensation
$3,819,752.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
Brown and Caldwell, Inc. 4/11/2026 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
PGSF WMVD Storm and Combined Sewer Design Scope of Work 08-25-2023 <br /> <br />5 of 41 <br /> <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />considerations, and change management documentation. <br />• Perform readability reviews for documents by technical editors. <br />• Perform discipline design reviews for all drawings and documents produced by a discipline. <br />• Perform reviews by facility leads for all discipline drawings and documents associated with <br />each facility. <br />• Conduct independent calculations review by experienced senior engineers. <br />• Design package review of documents issued for milestone reviews (BODR, Preliminary, <br />Intermediate, Final, Bid Set). <br />• QA/QC reviews will be documented with markup documents and/or comment logs for record- <br />keeping. <br />• Verify that QA/QC reviewers concur with work products. Maintain written documentation of <br />QA/QC reviews and written responses. <br />• Set up and administer Bluebeam Studio cloud based document review for, concurrent review <br />by City staff. Studio session will be prefaced by project training to City reviewers. <br />Everett Responsibilities <br />• Review and provide comments on draft QMP. <br />• Provide coordinated and consolidated collection of review comments and resolution of any <br />conflicting comments from the City reviewers prior to returning to the design team. <br />• Participate in the review process and provide independent review of products. <br />Work Products <br />• Quality Management Plan (QMP), draft and Final. <br />• Collection and storage of QA/QC documentation as required by the QMP. <br />• Responses and backcheck of alterations made for City’s review comments tabulated in an <br />Excel worksheet. <br />Predesign Work <br />The predesign phase will focus on reviewing existing TMs, the existing hydraulic model, and available <br />record drawings. Condition inspection and evaluation of the existing pipes anticipated for use by CO- <br />3 and CO-8 will occur. Further evaluation of the proposed stormwater pretreatment facilities is <br />included. With the above information, the existing hydraulic model will be re-evaluated to finalize <br />pipe sizes and locations. This work will be summarized in a basis of design report. <br />The Consultant and the City will host workshops during the predesign phase to review decisions <br />made throughout the course of this work. <br />Phase 200 –Predesign Management <br />Objective: The objective of this phase is to manage and direct the predesign process so that the <br />products of the predesign effort are of quality and reflect the City standards and preferences. The <br />predesign process will be managed to inform the foundation of the project moving forward. <br />Activities/Approach: The Design Manager(s) will lead this effort and will actively lead the predesign <br />process through regular meetings with the design team. This phase will also support the coordination <br />of the project design with the City through identified workshops. <br />A project issues log will be maintained by the Design Manager(s) to manage identification of design <br />issues and their resolution.
The URL can be used to link to this page
Your browser does not support the video tag.