PGSF WMVD Storm and Combined Sewer Design Scope of Work 08-25-2023 <br /> <br />19 of 41 <br /> <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />• Environmental and Cultural Resources Review <br />o Environmental Field Reconnaissance <br />Conduct a reconnaissance of the West Marine View Drive pipeline alignment to <br />determine if any portions of the alignment are within critical areas or their buffer. <br />Based upon aerial photo review, it appears the entire length is within developed right- <br />of-way, thus avoiding critical areas. <br />o Desktop Data Collection and Review <br />Review publicly available reports and information for the alignment. This information <br />will form the basis for the existing conditions assessment of the project and the <br />critical areas memorandum. <br />o Cultural Resources Review <br />Archaeologists will conduct a background literature review. Staff will monitor the <br />investigatory soil borings conducted by the geotechnical engineers in the project <br />areas to help determine the likelihood of encountering buried archaeological <br />artifacts. Prepare a report that meets the requirements of the Secretary of Interior <br />and Washington Department of Archaeology and Historic Preservation (DAHP) <br />documenting the findings in accordance with Executive Order 21-02. <br />It is assumed that discovery any artifacts during field investigations will not occur, <br />however an Inadvertent Discovery Plan will be prepared in the event of a discovery. <br />ESA recommends that the tribes be contacted about both the Port Gardner Storage <br />Facility Project as well as the West Marine View Drive Projects. ESA will assist with <br />preparation of Tribal notification materials for the city to distribute to the tribes. <br />• Environmental Documentation and Permitting <br />o Critical Areas Memorandum <br />Prepare a critical areas memorandum for the preferred pipeline alignment to discuss <br />existing conditions, potential impacts resulting from project implementation, and any <br />proposed mitigation measures. This document will be necessary for permit <br />submittals to the City of Everett. We anticipate that all construction will occur within <br />developed areas and public right-of-ways, however, some portions of the pipeline <br />alignment occur within the shoreline zone of the Snohomish River Channel/East <br />Waterway of Possession Sound. Direct impacts to critical areas are not anticipated. <br />o Permit Support <br />Lead the Shoreline Substantial Development permit efforts for the portions of the <br />pipeline alignment that are located within 200 feet of the Snohomish River <br />Channel/East Waterway of Possession Sound. ESA will assist with a pre-application <br />for the city of Everett and support the preparation of required permits as needed for <br />the City permits, which are anticipated to include the following: Shoreline Substantial <br />Development permit, critical areas review, clear and grade permit, building permit, <br />right of way use permit. ESA will assist with up to 2 NPDES Construction permits, but <br />the effort will be lead by Brown and Caldwell. <br />o SEPA Documentation <br />Prepare a SEPA checklist in accordance with WAC 197-1, and will include both the <br />Port Gardner Storage Facility project, as well as the West Marine View Drive project. <br />Review of the entire project together will avoid SEPA challenges on the basis of piece- <br />mealing. Budget for this task is split between the two projects. The City of Everett will <br />be responsible for public notification efforts.