My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Brown and Caldwell, Inc. 9/20/2023
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Brown and Caldwell, Inc. 9/20/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2026 3:27:40 PM
Creation date
9/22/2023 10:04:49 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Brown and Caldwell, Inc.
Approval Date
9/20/2023
Council Approval Date
9/13/2023
End Date
12/31/2027
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF WMVD Storm and Combined Sewer
Tracking Number
0003935
Total Compensation
$3,819,752.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
Brown and Caldwell, Inc. 4/11/2026 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
PGSF WMVD Storm and Combined Sewer Design Scope of Work 08-25-2023 <br /> <br />21 of 41 <br /> <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />Phase 340 – Public outreach and stakeholder support <br />Objective: To provide support to the City of Everett staff on developing public outreach materials and <br />coordinating with stakeholders. <br />Activities/Approach: The project will impact numerous businesses, private property, and the general <br />public. BC will provide support to the City in providing information for the public and coordinating <br />work on non-City of Everett properties and rights-of-ways. Currently identified stakeholders include: <br />• Port of Everett <br />• Naval Station Everett <br />• BNSF <br />• Adjacent businesses <br />• Adjacent parcel owners <br />• General public <br />Task Assumptions: <br />• Each coordination/outreach meeting will have two, 1 hour, virtual preplanning meetings. <br />Everett Responsibilities: <br />• Lead public outreach and stakeholder support <br />• Coordinate all meetings <br />• Preparation (printing, mailing, hosting) of outreach materials <br />Meetings: <br />• Up to 5 stakeholder coordination meetings, up to 2 hours each, in person, 2 BC staff <br />• Up to 5 public outreach meetings, up to 2 hours each, in person, 2 BC staff <br />Work Products: <br />• Draft and final presentation materials for each meeting. <br />• Design constraints based on stakeholder feedback for inclusion in bid documents. <br />• Meeting agendas and minutes. <br />Phase 350 – Grant funding / DOE coordination <br />Objective: To maximize DOE grant funding for use with storm drainage improvements in both design <br />and construction. <br />Activities/Approach: Engage DOE to learn requirements for both design and construction activities to <br />be eligible for available grant funding. Implement the identified requirements in both design and <br />construction activities. <br />Task Assumptions: <br />Everett Responsibilities: <br />• Participate in meetings <br />Meetings: <br />• Up to 4 coordination meetings with DOE, 2 hours in length, virtual, with 3 BC staff <br />Work Products
The URL can be used to link to this page
Your browser does not support the video tag.