My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Brown and Caldwell, Inc. 9/20/2023
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Brown and Caldwell, Inc. 9/20/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2026 3:27:40 PM
Creation date
9/22/2023 10:04:49 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Brown and Caldwell, Inc.
Approval Date
9/20/2023
Council Approval Date
9/13/2023
End Date
12/31/2027
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF WMVD Storm and Combined Sewer
Tracking Number
0003935
Total Compensation
$3,819,752.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
Brown and Caldwell, Inc. 4/11/2026 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
PGSF WMVD Storm and Combined Sewer Design Scope of Work 08-25-2023 <br /> <br />22 of 41 <br /> <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />• Meeting agendas and minutes <br />• Inputs into contract documents <br />Phase 360 –PGSF Coordination <br />Objective: To coordinate the PGSF site design with the conveyance improvements design. <br />Activities/Approach: <br />• Coordinate monthly and at design milestones with the PGSF site design (treatment) team to <br />identify coordination points and scheduling needs. <br />• Conduct coordination workshops, as needed. <br />Task Assumptions: <br />• 4 conveyance team and site design team workshops, in person, 2 hours in length <br />Everett Responsibilities <br />• Share information that impacts both contracts <br />• Participate in workshops, as needed. <br />Meetings: <br />• BC, virtual, internal monthly and design milestone meetings <br />• 4 in person workshops <br />Work Products: <br />• Inputs for design <br />Phase 370 – Design Milestone Model Confirmation <br />Objective: Confirm design decisions using the hydraulic model as the Design phase progresses. <br />Activities/Approach: This task includes the following activities: <br />• Update the hydraulic model with final diameter, alignment, material, invert elevations, and <br />operational decisions at 30%, 60% and 90% Design to confirm system performance. <br />• Characterize system performance (hydraulic gradelines, overflows, operational impacts, etc.). <br />Identify any changes from previous design milestone. Document any recommended design <br />changes for next design phase. <br />• Lead consultant team meeting to discuss modeling findings and decide on design direction <br />per impacts. <br />• Documentation of findings and design recommendations and design decisions in 1-page <br />brief memo per design milestone (30%, 60%, and 90%). <br />Task Assumptions <br />• Hydraulic model and modeling methodology is the same as Phase 240 modeling. <br />Everett Responsibilities <br />• Comments on design memos <br />Meetings <br />• 3 consultant team meetings
The URL can be used to link to this page
Your browser does not support the video tag.