Laserfiche WebLink
PGSF WMVD Storm and Combined Sewer Design Scope of Work 08-25-2023 <br /> <br />22 of 41 <br /> <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />• Meeting agendas and minutes <br />• Inputs into contract documents <br />Phase 360 –PGSF Coordination <br />Objective: To coordinate the PGSF site design with the conveyance improvements design. <br />Activities/Approach: <br />• Coordinate monthly and at design milestones with the PGSF site design (treatment) team to <br />identify coordination points and scheduling needs. <br />• Conduct coordination workshops, as needed. <br />Task Assumptions: <br />• 4 conveyance team and site design team workshops, in person, 2 hours in length <br />Everett Responsibilities <br />• Share information that impacts both contracts <br />• Participate in workshops, as needed. <br />Meetings: <br />• BC, virtual, internal monthly and design milestone meetings <br />• 4 in person workshops <br />Work Products: <br />• Inputs for design <br />Phase 370 – Design Milestone Model Confirmation <br />Objective: Confirm design decisions using the hydraulic model as the Design phase progresses. <br />Activities/Approach: This task includes the following activities: <br />• Update the hydraulic model with final diameter, alignment, material, invert elevations, and <br />operational decisions at 30%, 60% and 90% Design to confirm system performance. <br />• Characterize system performance (hydraulic gradelines, overflows, operational impacts, etc.). <br />Identify any changes from previous design milestone. Document any recommended design <br />changes for next design phase. <br />• Lead consultant team meeting to discuss modeling findings and decide on design direction <br />per impacts. <br />• Documentation of findings and design recommendations and design decisions in 1-page <br />brief memo per design milestone (30%, 60%, and 90%). <br />Task Assumptions <br />• Hydraulic model and modeling methodology is the same as Phase 240 modeling. <br />Everett Responsibilities <br />• Comments on design memos <br />Meetings <br />• 3 consultant team meetings