Laserfiche WebLink
PGSF WMVD Storm and Combined Sewer Design Scope of Work 08-25-2023 <br /> <br />38 of 41 <br /> <br />Category 2: Sensitive information <br />Category 2: For official use only / disclosure permissible by law. <br />o Details (3) <br />• Package 2 drawing list (39 pages): <br />o Cover page (1) <br />o Drawing list, standard notes (1) <br />o Standard symbols, line types, abbreviations, survey notes (1) <br />o Key Map (1) <br />o Conveyance Options plan and profile sheets (8) <br />o Structural Vault design plans and details (CO-11 regulator) (4) <br />o Utility relocate plan and profile sheets (4) (if identified) <br />o TESC sheets (4) <br />o Pavement restoration sheets (4) <br />o Traffic control sheets (7) <br />o Details (3) <br />• Package 3 drawing list (19 pages): <br />o Cover page (1) <br />o Drawing list, standard notes (1) <br />o Standard symbols, line types, abbreviations, survey notes (1) <br />o Key Map (1) <br />o Trenchless installation plan and profile (2) <br />o Utility relocate plan and profile sheets (2) (if identified) <br />o TESC sheets (2) <br />o Pavement restoration sheets (2) <br />o Traffic control sheets (2) <br />o Details (3) <br />• Package 4 drawing list (16 pages): <br />o Cover page (1) <br />o Drawing list, standard notes (1) <br />o Standard symbols, line types, abbreviations, survey notes (1) <br />o Key Map (1) <br />o Rehabilitation installation plan and profile (2) <br />o TESC sheets (2) <br />o Pavement restoration sheets (2) <br />o Traffic control sheets (3) <br />o Details (3) <br />Everett Responsibilities <br />• Review and provide comments for all documents for each package <br />Meetings <br />• Monthly team meetings <br />Work Products <br />• 60, 90, 100%, and Final Contract documents for up to 4 construction packages <br />Phase 620 – Final BODR <br />Objective: Update the preliminary BODR to reflect progress to date through the final design phase, <br />for each identified construction package. <br />Activities/Approach: