My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3409 FEDERAL AVE 2023-12-07
>
Address Records
>
FEDERAL AVE
>
3409
>
3409 FEDERAL AVE 2023-12-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 11:48:44 AM
Creation date
9/22/2023 1:19:59 PM
Metadata
Fields
Template:
Address Document
Street Name
FEDERAL AVE
Street Number
3409
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Structural: <br /> 16. The proposed project may include structural work. Structural drawings should be submitted as needed <br /> that include framing plans, sections, details, construction schedules, fastening schedules, materials <br /> requirements, general notes, special inspection requirements, etc. The drawings should substantiate <br /> compliance with the prescriptive requirements of the IRC. See IRC Sections R106.1.1 and R301.1. <br /> 17. The project may involve structural modifications that do not comply with the prescriptive limitations of <br /> the IRC. Where a structural design is performed per Section R301.1.3, structural drawings and <br /> calculations should be prepared by a professional engineer licensed in the state of Washington; the <br /> drawings and calculations should bear the seal and signature of the engineer. See RCW Sections <br /> 18.43.010, 18.43.020, and 18.43.070. <br /> 18. Details for the construction of the new walls should be included. The details should specify <br /> connections for the top and bottom framing plates to the existing structure. See IRC Sections R106.1.1 <br /> and R301.1. <br /> 19. A fastener schedule should be provided per IRC Table R602.3(1). Providing a reference to this table in <br /> the drawings does not satisfy this requirement. In addition, the make and model of proprietary <br /> hardware should be specified in the plans and details where used for connections. <br /> Review of your project will be performed in the order received once the required documentation has been <br /> submitted. Please let me know if you have questions. <br /> — Drew Martin, P.E.,S.E. <br /> Associate Engineer—Commercial Plans Examiner I Permit Services <br /> 425.257.8810 13200 Cedar Street, 2nd Floor, Everett,WA 98201 <br /> EVERETT Phone Hours: M/W/T: 8 am - 12 pm & 1 pm—3 pm;Tu: 1:00pm-3:00pm <br /> everettwa.gov/permits I Facebook I Twitter <br /> Note:Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant to the Public <br /> Records Act. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.