Amendment 1 PSA with Brown and Caldwell for Port Gardner Storage Facility Project <br />Exhibit A Scope of Work <br />6 <br />Task Assumptions <br />• City will directly provide the CM for the Demolition Package. A third-party CM Firm will not be <br />retained by the City. <br />• Demolition construction phase duration will be no longer than 6 months (Notice to Proceed until <br />Physical Completion). <br />• Meetings under Task 100 are without the Contractor and relate to services of BC as an Owner’s <br />Representative. <br />• BC will not host a document management system for the City and Contractor. BC’s file <br />management system will not be part of workflows for submittals, RFIs, and other construction <br />record documents. <br />• CA will be provided access to Inspector’s Daily Reports at a frequency to be decided with the City. <br />Everett Responsibilities <br />• Participate in meetings. <br />• Engage with CA to maintain familiarity with construction progress, needs, and issues. <br />Work Products <br />• None. <br />Task 200 – Field Services <br />Objective: Perform field activities and services that take place on-site at PGSF. Attend construction <br />meetings with the Contractor up to meeting allowances stated, including preparation and <br />documentation. <br />Activities/Approach: This task includes the following activities: <br />• Attendance at construction progress meetings. Attendance of special meetings consisting of pre- <br />submittal meetings, quality control meetings, and other special meetings as requested by the <br />City or City’s CM staff. <br />• Surveying activities consisting of establishment of benchmarks, verification of contractor <br />surveys, spot checks for structure and pipeline elevations, survey for change order designs, and <br />other survey needs. <br />• Corrosion control subconsultant site visits, field memoranda, and technical meetings attendance <br />allowance budget is limited to $5,000. <br />• Up to 8 periodic site visits of durations no more than 6 hours for one staff member by design <br />engineers for civil, utilities, electrical, and structural disciplines. Also see Task 300 for structural <br />observations required by building codes. <br />Task Assumptions <br />• City’s CM will administer and prepare construction progress meeting agenda and notes. <br />• City’s CM Field Representative will perform regular, day to day construction observation and <br />complete daily inspection reports to record construction activities on each working day. <br />• BC will prepare meeting agenda and notes for any special meetings requested by the Engineer. <br />Otherwise, special meetings requested by City, Contractor, or City’s CM staff will have meeting <br />notes prepared by City’s CM staff. <br />• Surveying activities allowance is for a 2-person crew cumulatively for 5 working days over the <br />construction duration.