installed at an absolute minimum.This was discussed on site with Andersen and remedies were <br /> underway. See attached photo#2.—#5 anchor reinforcing bars (unhooked,vertical leg only) were <br /> installed at the subject anchor. Note that bars were shorter than typical to fit within the confined <br /> space. Installed conditions appear acceptable to PSE for the subject anchor. <br /> - A large concrete block was noticed sitting in this area within the rebar cage region and should be <br /> removed prior to the pour. See attached photo#3.—Block appeared to have been removed by time <br /> of SO#4. Note that in the northwest corner instances were observed where CMU blocks were used <br /> to support bottom mat of rebar (similar to a dobie). Instances observed were acceptable to PSE. <br /> - A large steel rod was noticed on the edge of the foundation (south side near middle) and should be <br /> removed prior to the pour. See attached photo#4.—Observed to be corrected at SO#4. <br /> Instances of concrete dobies no longer needed for cover maintenance should be removed, if <br /> possible, prior to the pour. See attached photo#5.—Visibility was limited by formwork, anchor <br /> templates, and congested reinforcing at time of SO#4. PSE recommends Andersen review dobies <br /> and bar clearances prior to the pour. <br /> At the building column footing locations, the shorter threaded rods with the large steel plate washer <br /> (6" x 6") was elevated above the Styrofoam layer which deviated from the plans, however,this is <br /> acceptable as is. No adjustments are required prior to the pour.—Previously resolved. <br /> The wood forms for the keyway blockouts did not match the geometry on the contract plans. <br /> Possible resolutions were discussed in field, however, it was agreed that the best solution would be <br /> to reconstruct the key forms to be 12"x12" square at the large end and include a 3" deep taper <br /> along all edges, per the contract plans.—Corrected keyway blockout forms were observed and <br /> appeared to be in general conformance with PSE's plans. <br /> - At the pilaster dowels, irregularity in angle and elevation of the top of the form savers was <br /> observed.These should be corrected and adjusted for plumb-ness of the vertical leg for ease of <br /> installation of the future pilaster reinforcement bars. See attached photo#6.—Slight inconsistencies <br /> in elevation and plumbness remained during SO#4 (see attached photo 32). Prior to pour, review <br /> and correct formsaver/dowel locations to the greatest extent feasible.There shall be no instances <br /> where the top of formsavers are at an elevation below the finished surface. See previous email from <br /> Bill Sandbo on 2/15/2023 (see attached) regarding accommodating/adjusting formsavers that sit <br /> proud of the finished concrete surface. <br /> - El HESS Foundation SO3 Photos <br /> Items discussed during SO#4/Pre-pour Meeting: <br /> - One instance was noted in the northwest corner where both anchor reinforcing#5 bars were placed <br /> on the same side of a perimeter wall block anchor(see photo 43). Bars shall be relocated or added <br /> such that they are on either side of the anchor, as shown in Detail (4/SF7) of PSE's drawings. <br /> - PSE understands the pour is scheduled to begin around 4:OOam tomorrow. Potential cold weather <br /> impacts were discussed. PSE understands that Andersen doesn't plan to use heaters, but thermal <br /> blankets will be laid following the pour. <br /> - Bill Sandbo (PSE) intends to be present for part of the pour. <br /> - Boron Carbide to be added on site. PSE understands Andersen intends to keep a detailed log of <br /> boron carbide and other admixtures included in each truck load. <br /> - Concerns regarding concrete flow and stability were discussed. PSE understands representatives <br /> from Otto Rosenau will be present during the pour to sample for testing. <br /> - Anchor templates and formwork may limit the crew's ability to achieve desired finish.Andersen <br /> anticipates some additional finishing work following the removal of the template. <br /> - Andersen informed PSE that they intend to wet set the premolded joint filler material at the <br /> perimeter of the new mat foundation. <br /> Action Items: <br /> 2 <br />