My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sample 10/4/2023
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Sample 10/4/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2023 11:17:38 AM
Creation date
10/4/2023 10:58:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Sample
Approval Date
10/4/2023
Department
Legal
Department Project Manager
Tim Benedict
Subject / Project Title
Test
Tracking Number
0003969
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
497
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />Beverly Lake Water Quality Retrofit Division 1 – GENERAL REQUIREMENTS August 2023 <br />WO No – UP3745 SP – 109 <br />Float in a progress schedule belongs to the City. <br />Subcontractors shall review all schedules prior to submission to the City and City’s <br />Representative. At the City’s option and sole discretion, City may require Contractor to <br />obtain written acceptance of each schedule by Subcontractors as practical and feasible, <br />as the schedule relates to Subcontractors’ work. <br />Contractor shall not schedule any activity with an unrealistic, unduly long, or unduly short <br />duration. Contractor shall use its best efforts in good faith to set reasonable durations <br />for all activities. Contractor shall not attempt to “grab the Float” or make an effort to use <br />Float in the Progress Schedule for the benefit of the Contractor, rather than the benefit <br />of the Project. Contractor shall use its best efforts in good faith to minimize <br />dependencies, minimize the number of critical paths, and schedule the Project to be <br />complete as expeditiously as reasonably possible. <br />Contractor shall submit with each application for payment or progress pay estimate an <br />updated progress schedule, but no less often than monthly. If requested by the City’s <br />Representative or the City, Contractor shall prepare and submit updated progress <br />schedules from time to time that may be more frequent than monthly. <br />The Contractor hereby expressly agrees and acknowledges that any failure by <br />Contractor to provide accurate, complete, current and updated schedules at least <br />monthly constitutes a waiver of any and all claims or requests for adjustment of Contract <br />Sum or Time that arise out of, result from, or are caused by, any Delay on the Project or <br />scheduling of the Work. Timely submission of updated schedules at least monthly is a <br />condition precedent to any later or subsequent Contract Claim or request for an <br />adjustment of either Contract Sum or Time related to or arising out of time, an alleged <br />Delay, or the schedule or sequence of Work. Similarly, the parties agree the City may <br />withhold progress pay estimates if updated schedules are not timely submitted monthly. <br />These remedies are cumulative and not exclusive of other remedy. The City’s use of <br />one or more of these remedies does not constitute an election or prevent the City from <br />pursuing other remedies for this or other defaults. <br />No later than the pre-construction conference, Contractor shall submit a preliminary <br />schedule (“Preliminary Schedule”) for the entire Work to City’s Representative and City. <br />Contractor shall prepare such schedule in consultation with its Subcontractors. <br />1-08.3(2) Project Schedule Types <br />Delete 1-08.3(2), including its subsections, and substitute the following: <br />1-08.3(2) Project Schedule Requirements For Contracts Exceeding $500,000 <br />(******) <br />1-08.3(2)A Scheduler <br />Contractor represents and warrants that it employs, or will engage prior to <br />preparation of the Preliminary Schedule, a qualified scheduler. A "qualified <br />scheduler" is a person who has at least five years of full time, construction project <br />scheduling experience, who is familiar, competent and professional in creating, <br />maintaining and updating time scaled and resource loaded critical path schedules. <br />Contractor shall submit to the City the name, address, and qualifications of the <br />qualified scheduler to the City for approval no later than the pre-construction <br />conference. <br />1-08.3(2)B Baseline Schedule <br />The progress schedule submitted to the City’s Representative and City after their <br />review of the Preliminary Schedule shall be the Baseline Schedule. The Baseline <br />Schedule shall be the baseline schedule against which all future schedules are <br />compared and updated, and job progress is measured. The Baseline Schedule
The URL can be used to link to this page
Your browser does not support the video tag.