My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sample 10/4/2023
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Sample 10/4/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2023 11:17:38 AM
Creation date
10/4/2023 10:58:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Sample
Approval Date
10/4/2023
Department
Legal
Department Project Manager
Tim Benedict
Subject / Project Title
Test
Tracking Number
0003969
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
497
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Beverly Lake Water Quality Retrofit Division 5 – SURFACE TREATMENTS August 2023 <br /> <br />AND PAVEMENTS <br />WO No. – UP3745 SP - 182 <br />5-06.3(6) Temporary Pavement Patching <br />The Contractor shall furnish, place and maintain temporary pavement patching as shown <br />on the Plans and at locations as directed by the Engineer, until such time as a permanent <br />patch of permanent paving can be made. <br />Provide a temporary patch as required to reopen roadway during construction as that <br />withstands existing traffic loads and volumes. Options include, and are not limited to, <br />cold mix asphalt (MC 250), hot mix asphalt (HMA CL 1/2”, PG 64-22), or secured steel <br />roadway plates. <br />Provide temporary asphalt patching where roadway or walk is needed for vehicular or <br />pedestrian traffic, during the construction period, until permanent pavement and <br />sidewalks can be constructed. <br />In the event that the temporary surface subsides after the initial placement, apply <br />additional MC 250 or HMA (as approved by the Engineer) as necessary to maintain the <br />surface. <br />Stockpile of plant mix and crushed surfacing for temporary patching shall be provided <br />on the site by the Contractor. <br />Prior to final restoration of the pavement, the Contractor shall be responsible for <br />removing and disposing of temporary pavement patching materials. <br />5-06.3(7) Incidental Pavement Patching <br />Incidental pavement patching shall be done only at the direction of the Engineer for <br />patching and restoring areas between the back of new sidewalks and adjacent asphalt <br />driveways, paving ramps at the ends of sidewalks, and gutters that are adjusted to <br />grade. <br />Asphalt for incidental pavement patching shall be HMA CL 1/2”, PG 64-22. <br />5-06.4 Measurement <br />Bid items of Work completed pursuant to the Contract Documents will be measured as <br />described in Division B – Bid Item Descriptions of these Special Provisions and Section 1-09 <br />MEASUREMENT AND PAYMENT of the Standard Specifications. <br />5-06.5 Payment <br />Payment for bid items of Work completed pursuant to the Contract Documents will be as <br />described in Division B – Bid Item Descriptions of these Special Provisions and Section 1-09 <br />MEASUREMENT AND PAYMENT of the Standard Specifications. <br />
The URL can be used to link to this page
Your browser does not support the video tag.