My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.L. Alia Company 10/17/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
R.L. Alia Company 10/17/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2023 10:29:29 AM
Creation date
10/17/2023 9:12:24 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
R.L. Alia Company
Approval Date
10/17/2023
Council Approval Date
10/4/2023
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Beverly Lake Water Quality Retrofit
Tracking Number
0003987
Total Compensation
$1,175,015.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
R.L. Alia Company 10/30/2023
(Attachment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
R.L. Alia Company 10/30/2023 (2)
(Attachment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
497
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Beverly Lake Water Quality Retrofit Division P – PROPOSAL August 2023 <br />Work Order No. – UP3745 SP – 14 <br />Note: Unit prices for all items, all extensions, and the total amount bid must be shown. Where conflict occurs between the unit price and <br />the total amount named for any item, the unit price shall prevail, and totals shall be corrected to conform thereto. All entries must be <br />typed or entered in ink. <br />BID SCHEDULE <br /> BIDDER:___________________________ <br /> <br />Item <br />No. ITEM DESCRIPTION Unit Bid <br />Qty UNIT PRICE TOTAL AMOUNT <br />1 Mobilization LS 1 $_______.___ $______________.___ <br />2 Surveying LS 1 $_______.___ $______________.___ <br />3 Removal of Structures and Obstructions LS 1 $_______.___ $______________.___ <br />4 SPCC Plan LS 1 $_______.___ $______________.___ <br />5 Force Account/ Unexpected Conditions FA 1 $ 100,000.00 $ 100,000.00 <br />6 Traffic Control Labor HR 1300 $_______.___ $______________.___ <br />7 Maintenance & Protection of Traffic Control LS 1 $_______.___ $______________.___ <br />8 Trench Excavation Safety Systems LS 1 $_______.___ $______________.___ <br />9 Erosion/Water Pollution Control LS 1 _______.___ $______________.___ <br />10 Street Cleaning HR 150 $_______.___ $______________.___ <br />11 Saw Cutting Existing Improvements LF 1200 $_______.___ $______________.___ <br />12 Foundation Material Class A or B TON 100 $_______.___ $______________.___ <br />13 Crushed Surfacing Top Course TON 50 $_______.___ $______________.___ <br />14 Crushed Surfacing Base Course TON 506 $_______.___ $______________.___ <br />15 Gravel Borrow TON 588 $_______.___ $______________.___ <br />16 Schedule A Storm Sewer Pipe, 8 In. Dia. LF 25 $_______.___ $______________.___ <br />17 Schedule A Storm Sewer Pipe, 12 In. Dia. LF 470 $_______.___ $______________.___ <br />18 Catch Basin, Type 1 EA 3 $_______.___ $______________.___ <br />
The URL can be used to link to this page
Your browser does not support the video tag.