My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.L. Alia Company 10/17/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
R.L. Alia Company 10/17/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2023 10:29:29 AM
Creation date
10/17/2023 9:12:24 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
R.L. Alia Company
Approval Date
10/17/2023
Council Approval Date
10/4/2023
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Beverly Lake Water Quality Retrofit
Tracking Number
0003987
Total Compensation
$1,175,015.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
R.L. Alia Company 10/30/2023
(Attachment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
R.L. Alia Company 10/30/2023 (2)
(Attachment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
497
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Beverly Lake Water Quality RetrofitDivision P – PROPOSAL August 2023 <br />Work Order No. – UP3745 SP – 15 <br /> <br />Item <br />No. ITEM DESCRIPTION Unit Bid <br />Qty UNIT PRICE TOTAL AMOUNT <br />19 Catch Basin, Type 1L EA 1 $_______.___ $______________.___ <br />20 Catch Basin, Type 2, 48 In. Dia EA 3 $_______.___ $______________.___ <br />21 Water Quality Treatment Structure #1 LS 1 $_______.___ $______________.___ <br />22 Water Quality Treatment Structure #2 LS 1 $_______.___ $______________.___ <br />23 Water Quality Treatment Structure #3 LS 1 $_______.___ $______________.___ <br />24 Hydrodynamic Pretreatment #1 EA 1 $_______.___ $______________.___ <br />25 Hydrodynamic Pretreatment #2 EA 1 $_______.___ $______________.___ <br />26 Flow Splitter EA 3 $_______.___ $______________.___ <br />27 HMA, CL 1/2" PG 64-22 Ton 246 $_______.___ $______________.___ <br />28 Cement Concrete Sidewalk Restoration SY 127 $_______.___ $______________.___ <br />29 Cement Concrete Curb and Gutter, Type A-1 LF 296 $_______.___ $______________.___ <br />30 Cement Concrete Driveway, Type 1 SY 72 $_______.___ $______________.___ <br />31 Extruded Cement Concrete Curb LF 20 $_______.___ $______________.___ <br />32 Plastic Line LF 310 $_______.___ $______________.___ <br />33 Landscape Restoration LS 1 $_______.___ $______________.___ <br />34 Temporary Pavement Patch SY 50 $_______.___ $______________.___ <br />35 Temporary Water Main Protection LS 1 $_______.___ $______________.___ <br />36 Control Density Fill CY 80 $_______.___ $______________.___ <br /> $______________.___ <br /> <br />Total Bid Amount $__________.___ <br />The bid items above are described further in Division B – Bid Items Descriptions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.