My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.L. Alia Company 10/17/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
R.L. Alia Company 10/17/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2023 10:29:29 AM
Creation date
10/17/2023 9:12:24 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
R.L. Alia Company
Approval Date
10/17/2023
Council Approval Date
10/4/2023
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Beverly Lake Water Quality Retrofit
Tracking Number
0003987
Total Compensation
$1,175,015.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
R.L. Alia Company 10/30/2023
(Attachment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
R.L. Alia Company 10/30/2023 (2)
(Attachment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
497
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Beverly Lake Water Quality RetrofitDivision B – BID DESCRIPTIONS August 2023 <br />WO No. – UP3745 SP - 24 <br /> <br />DIVISION B - BID ITEM DESCRIPTIONS <br />Bid Item 1 - Mobilization <br />Measurement and Payment: Lump Sum (LS) <br />The lump sum bid for mobilization shall constitute complete compensation for all of <br />Contractor’s preconstruction costs of preparatory work and operations including, but not <br />limited to, those necessary for the movement of the Contractor’s personnel, equipment, <br />supplies and incidentals to the Project; for the establishment of its offices, buildings and other <br />facilities necessary for Work on this Project; for premiums on bonds and insurance for the <br />Project, and for Work and operations that the Contractor must perform or costs it must incur <br />before beginning production work on the various items on the Project. Mobilization also <br />includes, but is not limited to, posting construction identification signs, securing permits, <br />establishing safety and security measures, preparing a traffic control plan(s), preconstruction <br />photographs, developing a Schedule of Values for lump sum bid items, submitting the project <br />schedule and providing product and material submittals, and posting of notices and jobsite <br />posters as required by WSDOT 1-07.9(2). Also include mobilization costs for all <br />subcontracted work along with all costs for utility coordination noted on the Plans and in the <br />Specifications. <br />Items not included in this item include, but are not limited to: <br />(a) Work covered by a specific bid item or Work that is to be included in a bid item <br />or items. <br />(b) Profit, interest on borrowed money, overhead or management costs. <br />Partial payments will be made for the lump sum contract price for “Mobilization” as follows: <br />(c) When 5% of the total original contract amount is earned from other bid items, <br />50% of the amount bid for mobilization, or 5% of the total original contract <br />amount, whichever is the least, will be paid. <br />(d) When 10% of the total original contract amount is earned from other bid items. <br />100% of the amount bid for mobilization, or 10% of the total contract amount, <br />whichever is the least, will be paid. <br />Upon substantial completion, payment of any amount bid for mobilization in excess of 10% <br />of the total original contract amount will be paid. <br />Bid Item 2 - Surveying <br />Measurement and Payment: Lump Sum (LS) <br /> <br />The lump sum bid for surveying includes, but is not limited to, all costs associated with <br />furnishing all labor, tools, survey instruments materials, and other equipment necessary for <br />the setting and monitoring the location, elevation, alignment and grade of the Work as <br />specified in 1-05.4 CONFORMITY WITH AND DEVIATIONS FROM PLANS AND STAKES <br />and the Plans. <br />The lump sum bid item also includes, but is not limited to, all costs associated with furnishing <br />all labor, tools, survey instruments, materials and other equipment necessary for verifying the <br />rim and invert elevations, prior to construction, of all existing manholes and pipes where <br />connections are to be made. <br />The lump sum bid item also includes, but is not limited to, all costs associated with furnishing <br />all labor, tools, survey instruments, materials and other equipment necessary to prepare and <br />implement the survey monitoring plan described in Section 1-07.16(1)A <br />
The URL can be used to link to this page
Your browser does not support the video tag.