Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Beverly Lake Water Quality RetrofitDivision B – BID DESCRIPTIONS August 2023 <br />WO No. – UP3745 SP - 25 <br /> <br />The lump sum also includes, but is not limited to, all costs associated with furnishing all labor, <br />tools, survey instruments, materials and other equipment necessary for obtaining the “as <br />constructed” location and elevations of the Work, in particular, sewer pipe invert elevations <br />and other information necessary for production of the Record Drawing (As-Constructed) <br />documents meeting the requirements defined in RECORD DRAWINGS of these Special <br />Provisions. <br /> <br />Partial payments will be made for the lump sum contract price for “Surveying” as follows: <br />(e) When 10% of the total original contract amount is earned from other bid items, <br />50% of the amount bid for surveying will be paid. <br />(f) When redlines are received for preparing RECORD DRAWINGS, including all <br />information described above, 100% of the amount bid for surveying will be paid. <br /> <br />Bid Item 3 - Removal of Structures and Obstructions <br />Measurement and Payment: Lump Sum (LS) <br /> <br />The lump sum bid for Removal of Structures and Obstructions includes all costs associated <br />with complying with the requirements of Section 2-02 and 8-05. Payment for this lump sum <br />item includes, but is not limited to: <br /> <br />1. Removal and replacement of the existing condominium sign at 423 75th St SE <br />2. Remove or abandon existing storm drainage pipe or structures. <br />3. Removal of existing street trees. <br /> <br /> <br />If pavements, sidewalks, curbs, or gutters lie within an excavation area, their removal will be <br />paid for as part of the quantity removed in excavation. <br /> <br /> <br />Bid Item 4 - SPCC Plan <br />Measurement and Payment: Lump Sum (LS) <br />The lump sum bid for the Spill Prevention, Control and Countermeasures (SPCC) Plan <br />includes, but is not limited to, all costs associated with complying with the requirements of <br />Section 1-07.15(1) of the Standard Specification. <br />Bid Item 5 - Force Account/Unexpected Conditions <br />Measurement and Payment: Force Account (FA) <br />This Force Account bid item shall be accomplished in accordance with 1-09.6 FORCE <br />ACCOUNT; except, as modified below. <br />The Force Account bid item has been included for specific miscellaneous work items listed <br />below and for any additional work directed by the Engineer that is not required by the original <br />Contract and to address changed conditions or unanticipated work. The amount indicated in <br />the Proposal for this bid item is to provide a common bid amount. The actual amount paid <br />under this bid item may vary from no payment to the full amount of the bid item. Work <br />performed under this bid item will be initiated with a work directive issued by the Engineer,