R.L. Alia Company 10/17/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
R.L. Alia Company 10/17/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2023 10:29:29 AM
Creation date
10/17/2023 9:12:24 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
R.L. Alia Company
Approval Date
10/17/2023
Council Approval Date
10/4/2023
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Beverly Lake Water Quality Retrofit
Tracking Number
0003987
Total Compensation
$1,175,015.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
R.L. Alia Company 10/30/2023
(Attachment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
R.L. Alia Company 10/30/2023 (2)
(Attachment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
497
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Beverly Lake Water Quality RetrofitDivision B – BID DESCRIPTIONS August 2023 <br />WO No. – UP3745 SP - 25 <br /> <br />The lump sum also includes, but is not limited to, all costs associated with furnishing all labor, <br />tools, survey instruments, materials and other equipment necessary for obtaining the “as <br />constructed” location and elevations of the Work, in particular, sewer pipe invert elevations <br />and other information necessary for production of the Record Drawing (As-Constructed) <br />documents meeting the requirements defined in RECORD DRAWINGS of these Special <br />Provisions. <br /> <br />Partial payments will be made for the lump sum contract price for “Surveying” as follows: <br />(e) When 10% of the total original contract amount is earned from other bid items, <br />50% of the amount bid for surveying will be paid. <br />(f) When redlines are received for preparing RECORD DRAWINGS, including all <br />information described above, 100% of the amount bid for surveying will be paid. <br /> <br />Bid Item 3 - Removal of Structures and Obstructions <br />Measurement and Payment: Lump Sum (LS) <br /> <br />The lump sum bid for Removal of Structures and Obstructions includes all costs associated <br />with complying with the requirements of Section 2-02 and 8-05. Payment for this lump sum <br />item includes, but is not limited to: <br /> <br />1. Removal and replacement of the existing condominium sign at 423 75th St SE <br />2. Remove or abandon existing storm drainage pipe or structures. <br />3. Removal of existing street trees. <br /> <br /> <br />If pavements, sidewalks, curbs, or gutters lie within an excavation area, their removal will be <br />paid for as part of the quantity removed in excavation. <br /> <br /> <br />Bid Item 4 - SPCC Plan <br />Measurement and Payment: Lump Sum (LS) <br />The lump sum bid for the Spill Prevention, Control and Countermeasures (SPCC) Plan <br />includes, but is not limited to, all costs associated with complying with the requirements of <br />Section 1-07.15(1) of the Standard Specification. <br />Bid Item 5 - Force Account/Unexpected Conditions <br />Measurement and Payment: Force Account (FA) <br />This Force Account bid item shall be accomplished in accordance with 1-09.6 FORCE <br />ACCOUNT; except, as modified below. <br />The Force Account bid item has been included for specific miscellaneous work items listed <br />below and for any additional work directed by the Engineer that is not required by the original <br />Contract and to address changed conditions or unanticipated work. The amount indicated in <br />the Proposal for this bid item is to provide a common bid amount. The actual amount paid <br />under this bid item may vary from no payment to the full amount of the bid item. Work <br />performed under this bid item will be initiated with a work directive issued by the Engineer,