Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Beverly Lake Water Quality RetrofitDivision B – BID DESCRIPTIONS August 2023 <br />WO No. – UP3745 SP - 28 <br /> <br />Bid Item 12 - Foundation Material, Class A or B <br />Measurement and Payment: Unit Price per Ton (TON) <br />Measurement for Foundation Material, Class A or B shall be by the ton, recorded on certified <br />weight tickets in accordance with 1-09.2 WEIGHING EQUIPMENT, and placed within the <br />limits of dimensions defined in the Work, descriptions for other bid items, shown on the Plans, <br />or COE Standard Drawings, or as otherwise approved by the Engineer. <br />The unit price bid per ton shall constitute full compensation for all labor, tools, materials and <br />equipment required to furnish, place, and compact foundation material as specified in the <br />Standard Specifications, these Special Provisions and as shown on COE Standard Drawing <br />No. 614. <br />The unit price for this bid item includes all costs for dewatering and over-excavation, removal, <br />haul, and disposal of unsuitable subgrade material below the pipe zone or roadway subgrade. <br /> <br /> <br />Bid Item 13 - Crushed Surfacing Top Course <br />Measurement and Payment: Unit Price per Ton (TON) <br />Measurement for crushed surfacing base course will be by the ton as recorded on certified <br />weight tickets in accordance with 1-09.2 WEIGHING EQUIPMENT and limited to dimensions <br />defined in the Work, descriptions for other bid items, shown on the Plans, details or COE <br />Standard Drawings or as otherwise approved by the Engineer. <br />The unit price per ton shall be full compensation for all labor, compaction, material, tools, and <br />equipment necessary to furnish, haul, stockpile, place, grade, and compact imported crushed <br />surfacing base course for the Work as required, from a Contractor supplied source in <br />accordance with the Standard Specifications and these Special Provisions. <br />The unit price for crushed surfacing top course also includes all costs for controlling moisture <br />content and all costs for dewatering. <br />Also included in this bid item shall be the cost of all equipment required to remove existing <br />soils to attain proper elevations, compaction of native subgrade soils, as well as to uniformly <br />spread and compact the crushed surfacing material. <br />The unit price for this bid item includes all costs for removing, loading and disposing of <br />displaced unsuitable material, including haul. <br />Include in this bid item the cost of sprinkling during dry periods prior to placement of the <br />crushed surfacing and while spreading and compacting the material. <br />Payment for crushed surfacing top course will be by the ton of material placed and approved <br />by the Inspector. <br /> <br />Bid Item 14 - Crushed Surfacing Base Course <br />Measurement and Payment: Unit Price per Ton (TON) <br />Measurement for crushed surfacing base course will be by the ton as recorded on certified <br />weight tickets in accordance with 1-09.2 WEIGHING EQUIPMENT and limited to dimensions <br />defined in the Work, descriptions for other bid items, shown on the Plans, details or COE <br />Standard Drawings or as otherwise approved by the Engineer. In addition to surfacing, this <br />product will be paid by the ton for sewer and storm pipe bedding. Crushed Surfacing Base <br />Course material placed exceeding “neatline” quantities without advance authorization by the <br />Inspector will not be paid for.