My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.L. Alia Company 10/17/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
R.L. Alia Company 10/17/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2023 10:29:29 AM
Creation date
10/17/2023 9:12:24 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
R.L. Alia Company
Approval Date
10/17/2023
Council Approval Date
10/4/2023
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Beverly Lake Water Quality Retrofit
Tracking Number
0003987
Total Compensation
$1,175,015.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
R.L. Alia Company 10/30/2023
(Attachment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
R.L. Alia Company 10/30/2023 (2)
(Attachment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
497
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Beverly Lake Water Quality RetrofitDivision B – BID DESCRIPTIONS August 2023 <br />WO No. – UP3745 SP - 28 <br /> <br />Bid Item 12 - Foundation Material, Class A or B <br />Measurement and Payment: Unit Price per Ton (TON) <br />Measurement for Foundation Material, Class A or B shall be by the ton, recorded on certified <br />weight tickets in accordance with 1-09.2 WEIGHING EQUIPMENT, and placed within the <br />limits of dimensions defined in the Work, descriptions for other bid items, shown on the Plans, <br />or COE Standard Drawings, or as otherwise approved by the Engineer. <br />The unit price bid per ton shall constitute full compensation for all labor, tools, materials and <br />equipment required to furnish, place, and compact foundation material as specified in the <br />Standard Specifications, these Special Provisions and as shown on COE Standard Drawing <br />No. 614. <br />The unit price for this bid item includes all costs for dewatering and over-excavation, removal, <br />haul, and disposal of unsuitable subgrade material below the pipe zone or roadway subgrade. <br /> <br /> <br />Bid Item 13 - Crushed Surfacing Top Course <br />Measurement and Payment: Unit Price per Ton (TON) <br />Measurement for crushed surfacing base course will be by the ton as recorded on certified <br />weight tickets in accordance with 1-09.2 WEIGHING EQUIPMENT and limited to dimensions <br />defined in the Work, descriptions for other bid items, shown on the Plans, details or COE <br />Standard Drawings or as otherwise approved by the Engineer. <br />The unit price per ton shall be full compensation for all labor, compaction, material, tools, and <br />equipment necessary to furnish, haul, stockpile, place, grade, and compact imported crushed <br />surfacing base course for the Work as required, from a Contractor supplied source in <br />accordance with the Standard Specifications and these Special Provisions. <br />The unit price for crushed surfacing top course also includes all costs for controlling moisture <br />content and all costs for dewatering. <br />Also included in this bid item shall be the cost of all equipment required to remove existing <br />soils to attain proper elevations, compaction of native subgrade soils, as well as to uniformly <br />spread and compact the crushed surfacing material. <br />The unit price for this bid item includes all costs for removing, loading and disposing of <br />displaced unsuitable material, including haul. <br />Include in this bid item the cost of sprinkling during dry periods prior to placement of the <br />crushed surfacing and while spreading and compacting the material. <br />Payment for crushed surfacing top course will be by the ton of material placed and approved <br />by the Inspector. <br /> <br />Bid Item 14 - Crushed Surfacing Base Course <br />Measurement and Payment: Unit Price per Ton (TON) <br />Measurement for crushed surfacing base course will be by the ton as recorded on certified <br />weight tickets in accordance with 1-09.2 WEIGHING EQUIPMENT and limited to dimensions <br />defined in the Work, descriptions for other bid items, shown on the Plans, details or COE <br />Standard Drawings or as otherwise approved by the Engineer. In addition to surfacing, this <br />product will be paid by the ton for sewer and storm pipe bedding. Crushed Surfacing Base <br />Course material placed exceeding “neatline” quantities without advance authorization by the <br />Inspector will not be paid for.
The URL can be used to link to this page
Your browser does not support the video tag.