Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Beverly Lake Water Quality RetrofitDivision B – BID DESCRIPTIONS August 2023 <br />WO No. – UP3745 SP - 27 <br /> <br />Measurement for trench excavation safety systems shall be square foot of trench installed. <br />The square foot bid item includes the costs directly allocated to the safety system for trenches <br />and all other excavations including, but not limited to, shoring, benching, bracing, excavation, <br />sheeting, and trench box. This Work shall be accomplished in accordance with Divisions 1, <br />2, 7, and 8 of the Standard Specifications and these Special Provisions. Payment per lump <br />sum includes all equipment, materials, labor, installation, and removal, and all other work <br />required to meet the trench excavation and safety system requirements. <br />Bid Item 9 - Erosion/Water Pollution Control <br />Measurement and Payment: Lump Sum (LS) <br />Erosion/Water Pollution Control, Lump Sum, shall constitute full compensation for all labor, <br />materials, tools and equipment necessary and incidental for the installation, maintenance <br />and removal of the temporary erosion and sedimentation control (TESC) facilities to prevent <br />pollution, erosion, siltation, and damage to any wetland, stream, other watercourse, or <br />surrounding property throughout the life of the Contract. TESC facilities shall include, but not <br />be limited to, any cover measures, runoff control measures, soil and site stabilization <br />measures, silt fencing as shown on the Plans, and inlet protection measures for the work <br />area and downstream areas. <br />The TESC measures shall limit the erosion possibility by covering disturbed soils, preventing <br />sloughing or raveling of cut and natural slopes, and controlling surface runoff from flowing <br />into excavations using measures such as curbs, berms, dikes, rock-lined ditches, and other <br />approved measures. Filter fabric fence shall be used to treat small areas of non-concentrated <br />runoff prior to discharge from the site. <br />Bid Item 10 - Street Cleaning <br />Measurement and Payment: Unit Price per Hour (HR) <br />The unit price per hour for Street Cleaning & Sweeping shall be full compensation for all <br />labor, tools, incidentals, and equipment necessary to provide the street sweeping, cleaning, <br />and dust control water required for this project. <br />Measurement for street sweeping and cleaning will be by the hour for the actual time <br />consumed in pavement sweeping, cleaning and debris removal. No allowance will be made <br />for time consumed in making repairs to the equipment or for moving the equipment to or from <br />the site on which the street cleaning is ordered. No separate payment will be made for water <br />required for dust control and the normal operation of the pickup sweepers. <br /> <br />Bid Item 11 - Saw Cutting Existing Improvements <br />Measurement and Payment: Unit Price per Linear Foot (LF) <br />Measurement for saw-cutting will be per linear foot along the true length of the surface cut. <br />The unit price per lineal foot for the final saw-cutting of asphalt, concrete, steel rail, wood tie, <br />roadway debris material, or any combination of materials thereof, regardless of depth or <br />location of materials, shall be full compensation for all labor, material, tools, and equipment <br />necessary to satisfactorily complete the Work as specified in Section 2-02.3(3) of the <br />Standard Specifications, these Special Provisions and as shown on the Plans. The unit price <br />per lineal foot for saw-cutting includes, but is not limited to, the saw-cutting necessary for the <br />final joint between existing improvements and permanent HMA pavement. <br />Include cost of cleanup by vacuum collection and disposal of the cuttings slurry with this bid <br />item as there will be no separate payment for cleanup. Any necessary re-cutting due to <br />damage during excavation will not be remeasured for payment. <br />