Laserfiche WebLink
Seatronics, Inc. <br />Acceptance Test Procedure #111137 <br />Boeing Everett Final Assembly VESDA Systems <br />4.0 TEST PREPARATIONS <br />4.1 EQUIPMENT REQUIRED <br />4.1.1 Simulated smoke aerosol test spray. <br />4.1.2 Digital Voltage meter <br />4.2 TEST CONDITIONS - GENERAL <br />4.2.1 Notify interested parties that system tests are beginning. <br />4.2.2 Verify that all startup and pretests required have been completed. <br />4.2.3 Visually inspect the installation of all equipment to verify that it is <br />properly mounted. <br />4.2.4 Apply power to the system. Verify that the system is in normal <br />supervisory condition (power lamp is 'on" and all other lamps and <br />audible devices are 'off'). <br />5.0 ACCEPTANCE TESTS - ALARM CONDITIONS <br />5.1 DESCRIPTION OF EVENTS <br />Verify alarm conditions as specified in Tables 5-1 thru 5-4. For each alarm <br />condition listed, the appropriate system response should occur. After initiation of <br />each alarm condition, the following steps should be completed: <br />5.1.1 Alarm condition - silence audible alarms by depressing the alarm <br />acknowledge switch and then depressing the audible silence <br />switch. <br />5.1.2 Reset the control panel after the alarm condition system <br />response(s) have been verified. <br />