My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2308 TAYLOR DR 2023-12-08
>
Address Records
>
TAYLOR DR
>
2308
>
2308 TAYLOR DR 2023-12-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2023 1:27:00 PM
Creation date
10/20/2023 11:27:18 AM
Metadata
Fields
Template:
Address Document
Street Name
TAYLOR DR
Street Number
2308
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Drew Martin <br />From: Drew Martin <br />Sent: Monday, October 4, 2021 2:09 PM <br />To: jnevins1214@yahoo.com <br />Subject: City of Everett Permit Services: 2308 Taylor Drive (B2109-081) - First Building Intake <br />Review <br />Attachments: SnoCo Field Assessor Record_2308 Taylor Drive.pdf; 2018 IRC-Typical Code References_ <br />04-12-2021.docx; CoE_Residential Drawing Preparatio n_Edited 09-27-2021.pdf <br />Hello, Ms. Nevins. <br />Your application has been received and a permit set up. However, the submitted documents are not <br />sufficiently developed for us to perform a comprehensive review at this time. <br />Information is attached to provide guidance. Construction -level documents should be submitted for <br />review. Two complete sets of the revised drawings should be submitted to replace the previously submitted <br />drawing sets. Preliminary comments are provided below to assist in preparing the drawings, but these are not <br />intended to provide a comprehensive review. The resubmittal documents should include an itemized <br />response letter clarifying how the review comments below have been addressed. Depending on your <br />experience with the adopted codes and preparing documents, we recommend consulting with a design <br />professional to assist you. <br />Intake Review Comments: <br />General: <br />1. The project should specify the applicable building codes, including but not limited to the 2018 IRC, <br />2018 WSEC, and the 2018 IBC. See Section R106.1.1 and EMC Section 16.005.030. <br />The submitted documents include sketches for the proposed project. Construction -level drawings <br />prepared using established drafting standards are required to substantiate compliance with the <br />IRC. The drawings should include plans, building sections, details, material specifications, design loads, <br />architectural and structural notes, etc. as needed to clearly show the proposed work. The current <br />editions of the building codes applicable to the project should be specified. See IRC Section R106.1.1. <br />The submitted drawings appear to include prior unpermitted work, including but not limited to <br />creating new living space with a second kitchen, and modifying the existing living space (e.g., moving <br />bathroom and kitchen fixtures, modifying walls, etc.). The existing conditions shown in the drawings <br />are not consistent with the available City of Everett and Snohomish County records. A copy of the old <br />SnoCo Field Assessor record is attached; note that the SnoCo records only provide a record of the <br />building condition for the purpose of assessing taxes and do not substantiate a permitted <br />condition. The drawings are also not consistent with photography available on Google Earth and the <br />real-estate website Redfin.com. The drawings should be revised to show all previous unpermitted <br />work as new work; all new work is required to comply with the current code <br />requirements. Alternatively, the drawings should show the removal of unpermitted work and <br />
The URL can be used to link to this page
Your browser does not support the video tag.