My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Always Active Service 11/27/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Always Active Service 11/27/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2023 12:26:15 PM
Creation date
11/27/2023 11:40:05 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Always Active Service
Approval Date
11/27/2023
Council Approval Date
11/29/2023
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Citywide Bicycle Wayfinding Project
Tracking Number
0004034
Total Compensation
$363,113.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
408
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT - CITYWIDE BICYCLE WAYFINDING <br />STATE FUND# HLP-PB21(014) <br />WO#3786 September 25, 2023 <br /> 17 <br />Contractor shall immediately take such corrective measures as are necessary to remedy 1 <br />the listed deficiencies. Corrective work shall be pursued vigorously, diligently, and without 2 <br />interruption until physical completion of the listed deficiencies. This process will continue 3 <br />until the Engineer is satisfied the listed deficiencies have been corrected. 4 <br /> 5 <br />If action to correct the listed deficiencies is not initiated within 7 days after receipt of the 6 <br />written notice listing the deficiencies, the Engineer may, upon written notice to the 7 <br />Contractor, take whatever steps are necessary to correct those deficiencies pursuant to 8 <br />Section 1-05.7. 9 <br />The Contractor will not be allowed an extension of contract time because of a delay in the 10 <br />performance of the work attributable to the exercise of the Engineer’s right hereunder. 11 <br /> 12 <br />Upon correction of all deficiencies, the Engineer will notify the Contractor and the 13 <br />Contracting Agency, in writing, of the date upon which the work was considered physically 14 <br />complete. That date shall constitute the Physical Completion Date of the contract, but shall 15 <br />not imply acceptance of the work or that all the obligations of the Contractor under the 16 <br />contract have been fulfilled. 17 <br /> 18 <br />1-05.11(3) Operational Testing 19 <br /> 20 <br />It is the intent of the Contracting Agency to have at the Physical Completion Date a 21 <br />complete and operable system. Therefore when the work involves the installation of 22 <br />machinery or other mechanical equipment; street lighting, electrical distribution or signal 23 <br />systems; irrigation systems; buildings; or other similar work it may be desirable for the 24 <br />Engineer to have the Contractor operate and test the work for a period of time after final 25 <br />inspection but prior to the physical completion date. Whenever items of work are listed in 26 <br />the Contract Provisions for operational testing they shall be fully tested under operating 27 <br />conditions for the time period specified to ensure their acceptability prior to the Physical 28 <br />Completion Date. During and following the test period, the Contractor shall correct any 29 <br />items of workmanship, materials, or equipment which prove faulty, or that are not in first 30 <br />class operating condition. Equipment, electrical controls, meters, or other devices and 31 <br />equipment to be tested during this period shall be tested under the observation of the 32 <br />Engineer, so that the Engineer may determine their suitability for the purpose for which 33 <br />they were installed. The Physical Completion Date cannot be established until testing and 34 <br />corrections have been completed to the satisfaction of the Engineer. 35 <br /> 36 <br />The costs for power, gas, labor, material, supplies, and everything else needed to 37 <br />successfully complete operational testing, shall be included in the unit contract prices 38 <br />related to the system being tested, unless specifically set forth otherwise in the proposal. 39 <br /> 40 <br />Operational and test periods, when required by the Engineer, shall not affect a 41 <br />manufacturer’s guaranties or warranties furnished under the terms of the contract. 42 <br /> 43 <br />1-05.12 Final Acceptance 44 <br />1-05.12(1).RTF 45 <br />Add the following new section: 46 <br /> 47 <br />1-05.12(1) One-Year Guarantee Period 48 <br />(March 8, 2013 APWA GSP, may not be used on FHWA funded projects) 49 <br /> 50 <br />The Contractor shall return to the project and repair or replace all defects in 51 <br />workmanship and material discovered within one year after Final Acceptance of the 52
The URL can be used to link to this page
Your browser does not support the video tag.