My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Always Active Service 11/27/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Always Active Service 11/27/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2023 12:26:15 PM
Creation date
11/27/2023 11:40:05 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Always Active Service
Approval Date
11/27/2023
Council Approval Date
11/29/2023
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Citywide Bicycle Wayfinding Project
Tracking Number
0004034
Total Compensation
$363,113.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
408
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT - CITYWIDE BICYCLE WAYFINDING <br />STATE FUND# HLP-PB21(014) <br />WO#3786 September 25, 2023 <br /> 19 <br />after receipt of information that a change in Work has occurred. The Contractor shall not 1 <br />conceal any work until the required information is recorded. 2 <br /> 3 <br />This Record Drawing set shall be used for this purpose alone, shall be kept separate from 4 <br />other Plan sheets, and shall be clearly marked as Record Drawings. These Record 5 <br />Drawings shall be kept on site at the Contractor’s field office, and shall be available for 6 <br />review by the Contracting Agency at all times. The Contractor shall bring the Record 7 <br />Drawings to each progress meeting for review. 8 <br /> 9 <br />The preparation and upkeep of the Record Drawings is to be the assigned responsibility 10 <br />of a single, experienced, and qualified individual. The quality of the Record Drawings, in 11 <br />terms of accuracy, clarity, and completeness, is to be adequate to allow the Contracting 12 <br />Agency to modify the computer-aided drafting (CAD) Contract Drawings to produce a 13 <br />complete set of Record Drawings for the Contracting Agency without further investigative 14 <br />effort by the Contracting Agency. 15 <br /> 16 <br />The Record Drawing markups shall document all changes in the Work, both concealed 17 <br />and visible. Items that must be shown on the markups include but are not limited to: 18 <br /> 19 <br />· Actual dimensions, arrangement, and materials used when different than shown in 20 <br />the Plans. 21 <br />· Changes made by Change Order or Field Order. 22 <br />· Changes made by the Contractor. 23 <br />· Accurate locations of storm sewer, sanitary sewer, water mains and other water 24 <br />appurtenances, structures, conduits, light standards, vaults, width of roadways, 25 <br />sidewalks, landscaping areas, building footprints, channelization and pavement 26 <br />markings, etc. Include pipe invert elevations, top of castings (manholes, inlets, etc.). 27 <br /> 28 <br />If the Contract calls for the Contracting Agency to do all surveying and staking, the 29 <br />Contracting Agency will provide the elevations at the tolerances the Contracting Agency 30 <br />requires for the Record Drawings. 31 <br /> 32 <br />When the Contract calls for the Contractor to do the surveying/staking, the applicable 33 <br />tolerance limits include, but are not limited to the following: 34 <br /> Vertical Horizontal <br />As-built sanitary & storm invert and grate <br />elevations <br />± 0.01 foot ± 0.01 foot <br />As-built monumentation ± 0.001 foot ± 0.001 foot <br />As-built waterlines, inverts, valves, <br />hydrants <br />± 0.10 foot ± 0.10 foot <br />As-built ponds/swales/water features ± 0.10 foot ± 0.10 foot <br />As-built buildings (fin. Floor elev.) ± 0.01 foot ± 0.10 foot <br />As-built gas lines, power, TV, Tel, Com ± 0.10 foot ± 0.10 foot <br />As-built signs, signals, etc. N/A ± 0.10 foot <br /> 35 <br />Making Entries on the Record Drawings: 36 <br /> 37 <br />· Use erasable colored pencil (not ink) for all markings on the Record Drawings, 38 <br />conforming to the following color code: 39 <br />· Additions - Red 40
The URL can be used to link to this page
Your browser does not support the video tag.