My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Always Active Service 11/27/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Always Active Service 11/27/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2023 12:26:15 PM
Creation date
11/27/2023 11:40:05 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Always Active Service
Approval Date
11/27/2023
Council Approval Date
11/29/2023
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Citywide Bicycle Wayfinding Project
Tracking Number
0004034
Total Compensation
$363,113.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
408
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT - CITYWIDE BICYCLE WAYFINDING <br />STATE FUND# HLP-PB21(014) <br />WO#3786 September 25, 2023 <br /> 54 <br />post is located within a sidewalk area, the Contractor shall remove the post and finish 1 <br />the area to make the sidewalk continuous. Wood signs, wood sign posts, wood 2 <br />structures, metal sign posts, windbeams, and other metal structural members shall 3 <br />become the property of the Contractor and shall be removed from the project. 4 <br />Aluminum signs shall remain the property of the City of Everett. 5 <br /> 6 <br /> 7 <br />CAC 8-22 BIKE PAVEMENT MARKING.rtf 8 <br />8-22 PAVEMENT MARKING 9 <br />(******) 10 <br /> 11 <br />Section 8-22 of the Standard Specification is supplemented by the following: 12 <br /> 13 <br />8-22.2 Materials 14 <br /> 15 <br />All plastic marking shall be Type B or Type D plastic as described in section 8-22.3. Spray 16 <br />Type D is not allowed. 17 <br /> 18 <br />Where called for in the plans, green color pavement markings shall meet the 19 <br />requirements of MUTCD Interim Approval for Optional Use of Green Colored 20 <br />Pavement for Bike Lanes, IA-14. The color shall be green and will comply with FHWA 21 <br />standards for daytime and nighttime chromaticity values. 22 <br /> 23 <br />a. The daytime chromaticity coordinates for the color used for green colored 24 <br />pavement shall be as follows: 25 <br /> 26 <br />1 2 3 4 <br />x <br />0.230 <br />y <br />0.754 <br />x <br />0.266 <br />y <br />0.500 <br />x <br />0.367 <br />y <br />0.500 <br />x <br />0.444 <br />y <br />0.555 <br /> 27 <br />b. The daytime luminance factor (Y) shall be at least 7, but no more than 35. 28 <br /> 29 <br />c. The nighttime chromaticity coordinates for the color used for 30 <br />green colored pavement shall be as follows: 31 <br /> 32 <br />1 2 3 4 <br />x <br />0.230 <br />y <br />0.754 <br />x <br />0.336 <br />y <br />0.540 <br />x <br />0.457 <br />y <br />0.500 <br />x <br />0.479 <br />y <br />0.520 <br /> 33 <br /> 34 <br />8-22.3 Construction Requirements 35 <br /> 36 <br />Pavement markings shall be installed in accordance with Section 8-22.3 of the Standard 37 <br />Specifications with the following modifications: 38 <br /> 39 <br />1) All wide line and dotted extension line shall be Type D plastic flat line. 40 <br />2) Access parking space symbols, arrows, letters, and speed hump symbols shall be 41 <br />Type D extruded plastic flat line. Spray Type D is not allowed. 42
The URL can be used to link to this page
Your browser does not support the video tag.