Laserfiche WebLink
Mr. Jonathan Rempel <br />Plan Check Number: B2006-005, First Building Review <br />July 15, 2020 <br />3. The submitted sketches are not sufficient for a complete review to be performed. The sketches <br />are not Construction -level documents. Review comments have been provided to assist in <br />revising the construction drawings. However, these are intended to provide a preliminary <br />review only. Additional Comments may be provided pending a review of the revised submittal <br />documents. The construction drawings should be revised to dearly show the intended <br />construction. See IRC Section 106.1.1. Noted omissions included but are not limited to: <br />a. Clear plans and elevations for the proposed project, including all plan and elevation <br />dimensions. <br />b. Sections and detail references should be provided on the plans and elevations. Note that <br />the location of the "Vertical Cross Section" on Sheet C-1 is not clear and does not appear <br />consistent with the plans on Sheet A-2. <br />c. Specification of all framing members. The grades and sizes for all framing should be <br />specified. <br />d. Specification of preservative -treated or naturally durable framing where required. <br />e. Details for the connections between framing. The size, weather -protection (e.g., <br />galvanizing, etc.), and number of generic fasteners should be specified. The make and <br />model of proprietary hardware, including the size and number of fasteners, should be <br />provided. Minimum spacing, and end and edge distances for fasteners should be specified. <br />I. Sections and details for the foundations. <br />4. The submitted drawings have not been drawn to -scale. See notes on Sheet A-1 and C-1 for <br />examples. In addition, the project includes portions that are distorted and cannot be clearly <br />understood, such as the roof peak in the "Vertical Cross Section" on Sheet C-1. Revised scaled <br />drawings should be submitted for review. See the Residential Construction Submittal Checklist <br />provided in Permit Services portion of the City of Everett website: <br />httos://everettwa.eov/DocumentCenter/View/117/Residential-construction-submittal-checklist-PDF <br />5. The proposed drawings do not appear consistent with the existing construction of the building. <br />See IRC Section 106.1.1. Revised drawings that accurately depict the existing and proposed <br />construction should be submitted for review. Demolition drawings showing the existing <br />conditions should be included. The revisions should include, but are not limited to: <br />a. The existing building footprint is not consistent between the two levels. <br />b. The existing and new construction should be clearly delineated. Note that appears the <br />intended construction may be to change many or all of the interior walls on the Main Floor. <br />The bearing walls in the building should be identified. <br />a The Snohomish County Assessor indicates that the basement is unfinished. All construction <br />should be identified as new. <br />d. The east side of the Basement level appears to include above -grade exterior windows and <br />doors. However, this side of the basement is below -grade. <br />6. The proposed project includes converting the basement into a new dwelling unit. Each dwelling <br />unit is required to have egress access to a public way. The presumed exterior door on the east <br />side appears to open into a hillside. The design should be clarified. Where new retaining walls <br />are required, they should be shown on the plans. Details and calculations for the design of the <br />walls should be submitted for review per IRC Section R301.1.3. The egress door should be <br />provided with an exterior landing J per Section R311.3. See IRC Section <br />ion 106.1.1. <br />dar <br />evereUeps@evere <br />wa. <br />CO� Eve e e WA 88201 425.257.8957 fax ever ttwa.gov/perm is gov <br />Pne2d4 <br />