Laserfiche WebLink
the current di— a patterns. <br /> MR— 5 ONSITE STORMWATER MANAGEMENT <br /> Stormwater will be managed using BMP T5.12: Sheet flow Dispersion throughout <br /> the entire site. Under this BMP, the site will avoid concentrating flow and allow <br /> all stormwater to disperse and infiltrate over flat or moderately sloping surfaces. <br /> REFERENCES <br /> GeoEngineers, Smith Street Mill, Cleanup Action Plan, Everett WA, 2018. <br /> Smith Street Mill, Stormwater Pollution Protection Plan, Everett WA., 2019. <br /> 3 <br />