Laserfiche WebLink
Table of Contents <br /> 1.0 INTRODUCTION <br /> 2.0 SITE DESCRIPTION <br /> 2.1 Existing Conditions <br /> 2.2 Proposed Construction activities <br /> 3.0 CONSTRUCTION STORMWATER BMPs <br /> 3.1 The 12 BMP Elements <br /> 3.1.1 Element#1—Mark Clearing Limits <br /> 3.1.2 Element#2—Establish Construction Access <br /> 3.1.3 Element#3—Control Flow Rate <br /> 3.1.4 Element#4—Install Sediment Controls <br /> 3.1.5 Element#5—Stabilize Soils <br /> 3.1.6 Element#6—Protect Slope <br /> 3.1.7 Element#7—Protect Drain Inlets <br /> 3.1.8 Element#8—Stabilize Channels and Outlets <br /> 3.1.9 Element#9—Control Pollutants <br /> 3.1.10 Element#10—Control Dewatering <br /> 3.1.11 Element#11—Maintain BMPs <br /> 3.1.12 Element#12—Manage the Project <br /> 3.1.13 Element#13—Protect Low Impact Development BMPs <br /> 3.2 Site Specific BMPs <br /> 4.0 CONSTRUCTION AND BMP IMPELEMENTATION <br /> 5.0 POLLUTION PREVENTION TEAM <br /> 5.1 Roles and Responsibilities <br /> 5.2 Team Members <br /> 6.0 SITE INSPECTIONS AND MONITORING <br /> 6.1 Site Inspections <br /> 6.1.1 Site Inspection Frequency <br /> 6.1.2 Site Inspection Documentation <br /> 6.2 Stormwater Quality Monitoring <br /> 6.2.1 Turbidity Sampling <br /> 6.2.2 pH Sampling <br /> 7.0 REPORTING AND RECORDKEEPING <br /> 7.1 Recordkeeping <br /> 7.1.1 Site Log Book <br /> 7.1.2 Records Retention <br /> 7.1.3 Access to Plans and Records <br /> 7.1.4 Updating C-SWPPP <br /> 7.2 Reporting <br /> 7.2.1 Discharge Monitoring Reports <br /> 7.2.2 Notification of Noncompliance <br /> 2 <br />