Laserfiche WebLink
City of Everett Stadium Amphitheater Park Project Scope of Work Page 9 <br /> <br />Subtask 2.5 Scoping Summary Report <br />Following completion of the Scoping process and receipt of all scoping comments from the City, <br />the ESA Team will develop a Scoping Summary report for the City Team to review. The Scoping <br />Summary report will identify major themes and describe how those identified issues will be <br />addressed in the DEIS. The Scoping Summary report will also identify comments that are outside <br />the scope of DEIS. This is an important part of the overall SEPA Administrative Record and will be <br />attached as an appendix to the DEIS. The City may also choose to post it to their project website as <br />a transparent way for the public to see that their comments were received and considered. <br /> <br />Deliverables: <br />• Draft Scoping Summary Report (electronic format only) <br />• Final Scoping Summary Report (electronic format only) <br />Assumptions: <br />• One (1) round of City Team review <br />• The City will consolidate City comments prior to submitting to ESA. <br />Task 3 Public Outreach and Engagement <br />Task Objective: <br />Public outreach and engagement on the EIS will be led by the City with support from the ESA <br />Team. ESA will support the City Team by providing draft written content for outreach materials, <br />reviewing outreach materials, as well as facilitation and attendance at one virtual public meeting <br />for the scoping comment period and one virtual meeting for the DEIS comment period. ESA will <br />provide materials outlined below for use in materials, public meetings, and the EIS, as requested <br />by the City Team. <br /> <br />Subtask 3.1 Public Outreach Materials <br />ESA will develop draft and final written outreach content for materials for public noticing <br />consistent with the Everett Municipal Code, including posting notice, mailer/postcard to SEPA <br />mailing list, website content, notice for official City newspaper, and PowerPoint presentation (1 <br />draft, 1 final). The ESA Team will be responsible for producing the following materials for one <br />virtual scoping meeting and one virtual DEIS meetings: <br />• Posting notice (signage)- Per EMC Section 15.02.110, a site-specific proposal requires <br />posting notice in two places on or near the subject property. The ESA Team will prepare <br />content that follows specification in 15.02.110(A)(3). The City will order and pay for the <br />appropriate size and number of signs and post them at the appropriate site locations. <br />• Mailer/postcard for City to distribute to their SEPA mailing list – high-level overview of the <br />proposal, scoping/DEIS meeting details, and how to comment. City Website page content - <br />high-level overview of the proposal, SEPA process, schedule, scoping/DEIS meeting