My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2713 MAPLE ST A & B 2024-01-08
>
Address Records
>
MAPLE ST
>
2713
>
2713 MAPLE ST A & B 2024-01-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2024 4:11:24 PM
Creation date
12/21/2023 10:04:39 AM
Metadata
Fields
Template:
Address Document
Street Name
MAPLE ST
Street Number
2713
Unit
A & B
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Ismail Mohammad <br /> 2713 Maple Street, LLC <br /> Plan Check Number: B2101-051, First Building Review <br /> May 3, 2021 <br /> Egress: <br /> 16. Details should be provided for the construction of the stairs demonstrating compliance with <br /> Section 1011. The step height and depth should comply with Section 1011.5.2. See also the <br /> Structural comments below. <br /> Details for stairs and Egress requirements per IRC has been added to Sheet A6 Details. <br /> 17.The following comments should be addressed for the handrails in the main egress stairway <br /> serving the Upper Floor: <br /> a. Each side should be provided with a handrail. See IBC Section 1011.11. <br /> b. Details should be provided for the handrails complying with IBC Section 1014, including the <br /> height and extensions. Note that the extensions do not appear to comply with Section <br /> 1014.6. <br /> Details per IRC have been added to Sheet A6 Details for handrails and stairs requirements. <br /> Accessibility: <br /> 18.The two units on the first story should comply with the ICC A117.1-09 Chapter 10 for Type B <br /> units. See IBC Sections 1107.6.2.2.2 and 1107.7.1.1. Features required to be accessible <br /> include but are not limited to: <br /> a. Ingress at the front door including maneuvering clearances. <br /> b. Front door thresholds. <br /> c. Accessible routes throughout the dwelling. <br /> d. Minimum door widths. <br /> e. Bathroom clearances. <br /> f. Blocking for handrails in the bathrooms. <br /> g. Removable counters. <br /> h. Configuration of the kitchen and other facilities (e.g., washer and dryer access, etc.). <br /> The Proposed Project has been adjusted to be a duplex and comply with the IRC. <br /> Energy: <br /> 19.The construction drawings should specify the required thermal ratings for all windows and <br /> doors in the exterior walls. See WSEC-15 Table R402.1.3. <br /> Energy credits have been added per 2018 Table to Sheet A6 Details. <br /> Miscellaneous: <br /> 20.The window located at the intermediate landing for the main stairs on Sheet 3 is required to be <br /> safety glazing. See IBC Section 2406.4.6. <br /> (0), <br /> 3200 Cedar Street © 425.257.8810 0 everetteps@everettwa.gov <br /> Everett,WA 98201 425.257.8857 fax everettwa.gov/permits_-. —� <br /> Page,A.of T y�ry <br />
The URL can be used to link to this page
Your browser does not support the video tag.