My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
905 80TH ST SW FORMOST FUJI 2024-10-07
>
Address Records
>
80TH ST SW
>
905
>
FORMOST FUJI
>
905 80TH ST SW FORMOST FUJI 2024-10-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2024 12:02:02 PM
Creation date
12/26/2023 11:24:08 AM
Metadata
Fields
Template:
Address Document
Street Name
80TH ST SW
Street Number
905
Tenant Name
FORMOST FUJI
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Our intent based on early communication with you and other city personnel, is to use the Phase I storage mezzanine <br />under a temporary certificate of occupancy while the construction of the Phase II warehouse addition is being <br />constructed. The Phase II warehouse addition will provide level 2 human and forklift access to the Phase I storage <br />mezzanine which resides over the level 1 manufacturing area. The newly accessed warehouse will have (2) additional <br />man door exits accessible from the storage mezzanine along with accessible access to the main elevator connecting all <br />floors. <br />Our hope is that you could acknowledge this understanding via email so we're all clear on the intent and process. <br />Thank you very much! I'm available if you need to discuss on the phone as well (206-325-2553 ext. 4). <br />Harold Christensen <br />Architect <br />Lance Mueller & Associates I Architects <br />130 Lakeside Avenue, Suite 250 <br />Seattle, WA 98122 <br />206-325-2553 Office <br />206-328-0554 Fax <br />www.1ma-architects.com <br />2� ; f <br />
The URL can be used to link to this page
Your browser does not support the video tag.