Laserfiche WebLink
• "Draft Report of Geotechnical Engineering Services for Proposed Site Infrastructure Waterfront Place <br />Central Development, Everett, Washington," prepared for PND Engineers, Inc., by Landau Associates, <br />dated August 25, 2015. <br />• "Geotechnical Data Report, Parcel A.7 Port of Everett Waterfront Central Development Project, Everett, <br />Washington." prepared for PND Engineers. Inc., by Landau Associates, dated June 23, 2016, <br />• "Geotech n ical Data Report, Parcel A.8 Port of Everett Waterfront Central Development Project, Everett, <br />Washington," prepared for PND Engineers, Inc., by Landau Associates, dated June 23, 2016. <br />• "Geotechnical Data Report. Parcel A.12 Port of Everett Waterfront Central Development Project, <br />Everett, Washington," prepared for FIND Engineers, Inc., by Landau Associates, dated June 23, 2016. <br />• "Geotechnical Engineering Services- Waterfront Place Apartments, Everett, Washington," prepared for <br />SeaLevel Properties, by GeoEngineem, Inc., dated May 31, 2017, <br />• "Geotechnical Engineering Services - Fisherman's Harbor Hotel, Everett, Washington," prepared for <br />Great Wall Development, by GeoEngineers, Inc., dated June 27, 2017. <br />• "Port of Everett: Central Marina Improvements Phase 2 I Dock, Bulkhead Segment C, and Pacific RIM <br />Plaza Platform (Record Drawings)," dated November 20, 2017. <br />• "Port of Everett: Central Marina Improvements - Phase 3 (Record Drawings)," dated July 2018. <br />• "Port of Everett CMI Phase 3 Dredging - Overdredge Analysis Elevation Below Allowable Overdepth <br />Pre -Dredge versus Post -Dredge," prepared by Dalton Olmsted Fuglevand, dated February 27, 2019. <br />• "Port of Everett Waterfront Place Cartel - A17 Schematic Design," prepared for Port of Everett, by <br />Cushing Terrell, dated January 19, 2021, <br />2.1. Bulkhead Conditions <br />The project site at Parcel A17 is located approximately 600 feet west to the intersection of Seiner Drive <br />and 14�Street, along the bulkhead parallel to 14' Street as shown in the Site Plan (Figure 2). <br />Based on our review of the available design drawings, we understand that the existing bulkhead adjacent <br />to Parcel A17 consists of a steel sheet pile wall with one row of tiebacks connected to a continuous concrete <br />doorman, which is located approximately 50 feet behind the sheet pile wall. The top of the existing <br />bulkhead is at about Elevation +16.67 feet. The lip of the existing sheet pile Is at about Elevation 35.00 <br />feet. The existing tieback is located at about Elevation +11.85 feet Per our discussion with the project <br />team on June 22, 2021, an old continuous concrete deadman is sitting in front of the existing deadman <br />and functioning as a whole with the existing deadman. <br />Per the dredge section (@9+50) in me design mewing, we understand that it was proposed to dredge the <br />soils in front of the bulkhead at a 2.5H:1V slope from Elevation 0.00 feet to Elevation -9.00 feet. Note that <br />the project vertical datum is Mean Lower Low Water IMLLW). <br />2.2. Subsurface Conditions <br />Based on our review of the existing subsurface information available within the site vicinity, the soils at the <br />project site generally consist of fill, recent deposits, and glacially consolidated soils. FlII typically consists of <br />GEGENGINEEaS 67 D=Mr20202 o1 Paa2 <br />