My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMS Infrastructure Management Services 12/27/2023
>
Contracts
>
6 Years Then Destroy
>
2025
>
IMS Infrastructure Management Services 12/27/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 10:59:14 AM
Creation date
1/3/2024 10:56:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMS Infrastructure Management Services
Approval Date
12/27/2023
End Date
12/15/2025
Department
Procurement
Department Project Manager
Bert Cueva
Subject / Project Title
Pavement Assessment
Tracking Number
0004114
Total Compensation
$111,980.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett | RFP No. 2023-057 <br />November 2, 2023 <br />IMS Infrastructure Management Services, LP 32 <br />City of Beaumont, Texas – 2012, 2015, 2020, 2023 <br />IMS is currently providing <br />pavement data collection, analysis, <br />and reporting services to the City <br />of Beaumont as a long-time and <br />trusted service provider. IMS <br />served as the prime consultant for <br />the city’s transition from Lucity to <br />Cityworks in 2020. Originally <br />contracted as a pavement <br />condition update to the city’s <br />Lucity system using an IMS LCMS- <br />2-equipped RST; the scope of the <br />project was changed after data <br />collection was complete. The <br />revisions to the scope included <br />modifying data segmentation to fit <br />a new GIS centerline, ROW <br />imagery, and the ability to link a management system to Cityworks. To accomplish the final <br />task, IMS’ ESA spreadsheet was used to generate condition and funding forecasts which were <br />subsequently field mapped to the appropriate locations within Cityworks. IMS trained city staff <br />in the functions within ESA and the process to sync with Cityworks, emphasizing the longevity <br />of initial decisions and how to get the most out of the final reports. IMS prepared a 5-year <br />pavement management plan and presented the final recommendations to the city council. <br /> <br />Owner Reference: Bart Bartkowiak, Director of Public Works and Technology Services <br />Email: bart.bartkowiak@beaumonttexas.gov | Phone: (409) 880-3752 <br />Owner Address: 801 Main Street, Beaumont, Texas 77701 <br /> <br />2023 Contract Title: Pavement Data Collection, Analysis, Report <br />2023 Contract No.: Resolution No. 23-075 <br />2023 Contract Start and Completion Dates: 03/2023 – 09/2023 <br /> <br />Team Members Involved: Kurt Keifer, PhD, PE, Principal Engineer; Dave Bratton, PE, Project <br />Manager; Geoff Dew, Director of Operations
The URL can be used to link to this page
Your browser does not support the video tag.