My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2328-98
>
Ordinances
>
Ordinance 2328-98
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2014 3:04:18 PM
Creation date
3/20/2014 3:04:11 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2328-98
Date
9/23/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. Final Review and Approval Process <br /> 1. Required Review Process: <br /> a) Prior to submittal of any preliminary cluster alternative to the City for <br /> final approval, the applicant must demonstrate compliance with all the <br /> conditions and requirements of the preliminary approval and prepare all <br /> of the necessary final documents as required in Section 4.E of this <br /> Ordinance. <br /> b) A final cluster subdivision or cluster short subdivision shall be reviewed <br /> using the review process as required for final subdivisions and short <br /> subdivisions as defined in Section 2.H of this Ordinance. <br /> 33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.