My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lincoln Construction, Inc 2/2/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Lincoln Construction, Inc 2/2/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 9:27:48 AM
Creation date
2/2/2024 10:10:36 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lincoln Construction, Inc
Approval Date
2/2/2024
Council Approval Date
1/31/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Demolition Project
Tracking Number
0004167
Total Compensation
$3,041,841.87
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Lincoln Construction 10/2/2024 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1084
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 01 22 13 - 1 <br />Port Gardner Storage Facility - Demolition Package WO# UP-3525 <br />01 22 13 - 1 MEASUREMENT AND PAYMENT <br />SECTION 01 22 13 – MEASUREMENT AND PAYMENT <br />1.1 SUBMITTALS <br />A. Submittals: <br />1. Schedule of Values: Submit on Contractor’s standard form. <br />2. Schedule of Estimated Progress Payments: <br />a. Submit with initially acceptable Schedule of Values. <br />b. Submit adjustments thereto with Application for Payment. <br />3. Application for Payment. <br />4. Final Application for Payment. <br />1.2 SCHEDULE OF VALUES <br />A. At least fifteen (15) days prior to submitting the first Application for Payment, the <br />Contractor shall submit to the Engineer, for review and approval, a complete breakdown <br />of component of all lump sum bid items showing the value assigned to each portion of <br />work. <br />B. Upon request of the Engineer, provide documentation to support the accuracy of the <br />Schedule of Values. <br />C. Lump Sum Work: <br />1. Reflect specified allowances and alternates, as applicable. <br />2. List bonds and insurance premiums, mobilization, demobilization, preliminary and <br />detailed progress schedule preparation, equipment testing, facility startup, and <br />contract closeout separately. <br />a. Include item(s) for monthly progress schedule update. <br />3. Schedule of Values shall, once approved by Engineer, be used as the basis for <br />reviewing and determining each monthly progress payment and as such shall be <br />subject to periodic review by the Engineer to assure that the Schedule of Values <br />reasonably represents, in the opinion of the Engineer, the actual value of the <br />individual items of work performed. <br />D. An unbalanced or front-end loaded schedule will not be acceptable. <br />E. Summation of the complete Schedule of Values representing all Work shall equal the <br />Contract Price. <br />F. Submit Schedule of Values in a spreadsheet format compatible with latest version of <br />MS Excel. <br />1.3 SCHEDULE OF ESTIMATED PROGRESS PAYMENTS <br />A. Show estimated payment requests throughout Contract Times aggregating initial <br />Contract Price.
The URL can be used to link to this page
Your browser does not support the video tag.