My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lincoln Construction, Inc 2/2/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Lincoln Construction, Inc 2/2/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 9:27:48 AM
Creation date
2/2/2024 10:10:36 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lincoln Construction, Inc
Approval Date
2/2/2024
Council Approval Date
1/31/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Demolition Project
Tracking Number
0004167
Total Compensation
$3,041,841.87
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Lincoln Construction 10/2/2024 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1084
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 01 22 13 - 2 <br />Port Gardner Storage Facility - Demolition Package WO# UP-3525 <br />01 22 13 - 2 MEASUREMENT AND PAYMENT <br />B. Base estimated progress payments on initially acceptable progress schedule. Adjust to <br />reflect subsequent adjustments in progress schedule and Contract Price as reflected by <br />modifications to the Contract Documents. <br />1.4 APPLICATION FOR PAYMENT <br />A. Transmittal Summary Form: Attach one Summary Form with each detailed Application <br />for Payment and include Request for Payment of Materials and Equipment on Hand as <br />applicable. Execute certification by authorized officer of Contractor. <br />B. Use detailed Application for Payment Form suitable to the City and Engineer. <br />C. Include accepted Schedule of Values for each portion of lump sum Work and the unit <br />price breakdown for the Work to be paid on a unit priced basis. <br />D. Include separate line item for each Change Order and Work Change Directive executed <br />prior to date of submission. Provide further breakdown of such as requested by the <br />Engineer. <br />E. Preparation: <br />1. Round values to nearest dollar. <br />2. Submit Application for Payment, including a Transmittal Summary Form and <br />detailed Application for Payment Form(s) for each schedule as applicable, a listing <br />of materials on hand for each schedule as applicable, and such supporting data <br />as may be requested by the Engineer. <br />F. No applications for payment will be reviewed or approved until all Action & Informational <br />submittals have been submitted, reviewed by Owner, and approved. <br />1.5 PAYMENT <br />A. Payment for all Lump Sum Work shown or specified in Contract Documents is included <br />in the Contract Price. Payment will be based on a percentage complete basis for each <br />line item of the accepted Schedule of Values. <br />1.6 NONPAYMENT FOR REJECTED OR UNUSED PRODUCTS <br />A. Payment will not be made for following: <br />1. Loading, hauling, and disposing of rejected material. <br />2. Quantities of material wasted or disposed of in manner not called for under <br />Contract Documents. <br />3. Rejected loads of material, including material rejected after it has been placed by <br />reason of failure of Contractor to conform to provisions of Contract Documents. <br />4. Material not unloaded from transporting vehicle. <br />5. Defective Work not accepted by Owner. <br />6. Material remaining on hand after completion of Work.
The URL can be used to link to this page
Your browser does not support the video tag.