Laserfiche WebLink
PROJECT: City of Everett <br />WFP EMERGENCY GENERATOR REPLACEMENT WO No. 3587 <br />WORK CHANGE DIRECTIVE – No. 007 <br />DATE OF ISSUANCE: FEBUARY 01, 2023 <br />You are directed to proceed promptly with the following change (s): <br /> <br />Description: Revise the grading and pavement restoration in the area around the Location 1 <br />fuels tank slab. <br /> <br /> <br />Purpose of WCD-007: The per plan grading paving plan will result in ponding water in the area <br />of the fuel tank slab. Additional pavement removal and grading is necessary to promote <br />drainage. Costs will be tracked on a time and materials basis. Payment will be made through <br />Bid Item #20, Force Account. <br /> <br /> <br /> <br />If a claim is made that the above change(s) have affected Contract Price or Contract Times, any <br />claim for a Change Order based thereon will involve one or more of the following methods of <br />determining the effect of the change(s). <br /> <br />Method of determining change Method of determining change <br />In Contract Price: in Contract Times: <br />Lump Sum Contractor’s records <br /> <br />Time and Material Engineer’s records <br /> <br />Other - Other <br /> <br />Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract <br />Times: <br />$8,000.00 Substantial Completion 0 days: <br />If the change involves an increase, the Ready for final payment 0 days: <br />estimated amount is not to be exceeded If the change involves an increase, the <br />estimated without further authorization. times are not to be exceeded without further <br />authorization. <br /> <br />ACCEPTED: IMCO General Construction AUTHORIZED: City of Everett <br /> <br />By: Date: By: Date: (Authorized Signature) (Authorized Signature) <br /> <br />Page 1 of 1