Laserfiche WebLink
WFP Emergency Generator - IMCO General Construction - Grading and Paving Restoration <br />20.00 <br />NA <br />HOURS RATE HOURS RATE <br />15.0 77.090 1156.35 <br />9.0 68.190 613.71 <br />14.0 54.620 764.68 <br />0.00 <br />0.00 <br />2534.74 <br />735.07 <br />3269.81 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />IN USE AMOUNT <br />9.0 EST 715.05 <br />5.0 EST 312.65 <br />5.0 EST 833.85 <br />5.0 EST 59.20 <br />9.0 EST 284.58 <br />1861.55 <br />0.00 <br />390.93 <br />2252.48 <br />AMOUNT <br />8980.20 <br />425.00 <br />0.00 <br />0.00 <br />9405.20 <br />1128.62 <br />10533.82 <br />TOTAL SUBCONTRACTOR $ <br />12% MARKUP FOR FORCE ACCOUNT SUBCONTRACT <br />SUBTOTAL EQUIPMENT $ <br />LT0267 2012 Ford F350 Crew Cab 4 Light Duty Truck 31.62 <br />QTYUNIT UNIT PRICE <br />TN <br />LSCut-All Concrete Gas Slab Saw as Directed 1.00 425.00 <br />TOTAL MATERIALS $ <br />NAME DESCRIPTION <br />Northshore Paving LLC Pave with 3' of 1/2 HMA 16.63 540.00 <br />21% MARKUP FOR FORCE ACCOUNT MATERIALS <br />SUBTOTAL MATERIALS $ <br />21% MARKUP FOR FORCE ACCOUNT EQUIPMENT <br />SUBTOTAL EQUIPMENT $ <br />Hydraulic Impact Breakers <br />DESCRIPTION <br />CM1443 2021 Wacker DPU655HEH Vibratory Compactor <br />EX0448 2013 Cat 305E CRCN Mini Compact Excavator <br />YEAR/MAKE/MODEL/EQ# <br />EQUIPMENT <br />Subcontractor <br />LABOR <br />TOTAL EQUIPMENT $ <br />FL0533 2013 Genie 8000# Reach Lift Truck <br />HR0107 2013 Cat H65 Mini Breaker <br />TOTAL LABOR $ <br />UNIT QTY PRICEDESCRIPTION (Include Size, Type, Manufacturer, Etc..)VENDOR <br />MATERIALS <br />29% MARKUP FOR FORCE ACCOUNT LABOR <br />SUBTOTAL LABOR $ <br />Carpenter <br />Laborer <br />Corey Davis <br />Sam King <br />Grayson Luttrell <br />Operator Foreman <br />NAME <br />DAILY FORCE ACCOUNT FIELD DOCUMENTATION <br />FORCE ACCOUNT BID ITEM OR CO #: <br />DATE WORK PERFORMED: <br />REPORT #: <br />CONTRACTOR TRACKING #: <br />DATE: <br />PROJECT NAME or WP#:WFP Emergency Generator <br />Tuesday, February 28, 2023 <br />TRADE/CLASSIFICATION AMOUNT <br />TOTAL EQUIPMENT RENTAL TAX $ <br />Revise the grading and pavement restoration in the area around the Location 1 fuel tank slab.Description of Work: <br />CONTRACTOR PERFORMING <br />WORK: <br />REPORTED BY: <br />IMCO <br />Colbi Bertrand <br />AMOUNT <br />STRAIGHT TIME OVERTIME <br />RENTAL RATEBLUE BOOK RATE <br />RENTEDHOURSCONTR. OWNED <br />11.84 <br />79.45 <br />62.53 <br />166.77