My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction, Inc 2/8/2024 Change Order 1
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc 2/8/2024 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 3:06:51 PM
Creation date
2/8/2024 12:23:35 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc
Approval Date
2/8/2024
Council Approval Date
7/27/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Emergency Generator Replacement
Public Works WO Number
UP3587
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0003461
Total Compensation
$556,438.88
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction Inc. 8/27/2022
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
WFP Emergency Generator - IMCO General Construction - Grading and Paving Restoration <br />16056.11TOTAL $ <br />SUBMITTED BY - CONTRACTOR/ PRINT NAME REQUIRED - OWNER REP./ PRINT NAME <br />Owner Rep to Mark if Applicable: <br />GC SIGNATURE FOR SUBS (optional)SUBMITTED BY - CONTRACTOR/ SIGN & DATE REQUIRED - OWNER REP./ SIGNATURE & DATE <br />IMCO / Mitchell Sorestad City of Everett / Bill Fisher <br />Work witnessed but entitlement to be paid as extra work has not been determined <br />The contractor certifies that the contents listed on this sheet are a complete and accurate listing of the Force Account work performed today. <br />The owners representative verifies that this is a fair and reasonable listing of the labor, material and equipment quantities used but it is not an <br />authorization for payment until all backup for costs are submitted, verified and approved by the Resident Engineer
The URL can be used to link to this page
Your browser does not support the video tag.