• • M x <br /> • Install tile specs per details in the architectural plans and finish schedule <br /> o Millwork/Appliances/Fixtures: <br /> • Furnish/install decorative screens in the locations identified in the architectural <br /> plans per the millwork details <br /> • Furnish/install new cabinetry and counters in the locations identified in the <br /> architectural plans per the millwork details <br /> • Furnish/install appliance per spec schedule <br /> • General Contractor to confirm identified appliances will fit within their <br /> respective locations per the dimensions listed in the millwork details <br /> • NOTE: Banquet seating will be owner furnished FF&E <br /> • Private Dining Room <br /> o Flooring: <br /> • Remove and properly dispose of existing flooring <br /> • Prep subfloor as needed and per manufacturers specifications <br /> • Furnish/install new flooring and base per the Floor Finish Plan <br /> • Work is to be coordinated around high resident traffic hours <br /> • General Contractor to submit a phasing schedule for approval by the Project <br /> Manager <br /> o Paint: <br /> • Prep and paint walls, ceilings, doors, and trim per spec in the Wall Finish Schedule <br /> • Two coats and primer where necessary <br /> • Patching, sanding and/or caulking as needed <br /> • Ensure surface is clean prior to painting <br /> • Excessive, non-repairable, damage to be reviewed on a case by case basis <br /> o Lighting/Electrical: <br /> • Furnish/install lighting per Reflected Ceiling Plan <br /> • Installation of low voltage items per the Power Plans, by others <br /> o Provide in-wall blocking as needed and mount TV in location identified within the <br /> architectural plan <br /> • Discovery <br /> o Flooring: <br /> • Remove and properly dispose of existing flooring <br /> • Prep subfloor as needed and per manufacturers specifications <br /> • Furnish/install new flooring and base per the Floor Finish Plan <br /> • General Contractor to submit a phasing schedule for approval by the Project <br /> Manager <br /> o Paint: <br /> • Prep and paint walls,ceilings, doors, and trim per spec in the Wall Finish Schedule <br /> • Two coats and primer where necessary <br /> • Patching, sanding and/or caulking as needed <br /> • Ensure surface is clean prior to painting <br /> • Excessive, non-repairable,damage to be reviewed on a case by case basis <br /> o Lighting/Electrical: <br /> • Furnish/install lighting per Reflected Ceiling Plan <br /> • Installation of low voltage items per the Power Plans by others <br /> Effective Date:9/8/2022 <br /> V15 <br />