• • <br /> o Wall Construction: <br /> ■ Construct new partitions and doors per details noted in architectural plans <br /> ■ General contractor to furnish new door,trim, and hardware per spec schedule <br /> ■ General Contractor to supply and install new electrical devices per drawings <br /> o Millwork: <br /> ■ Furnish/install new cabinetry and counters in the locations identified in the <br /> architectural plans per the millwork details <br /> o Provide in-wall blocking as needed and mount TV in location identified within the <br /> architectural plan <br /> • Admin Offices <br /> o Flooring: <br /> ■ Remove and properly dispose of existing flooring <br /> ■ Prep subfloor as needed and per manufacturers specifications <br /> ■ Furnish/install new flooring and base per the Floor Finish Plan <br /> ■ General Contractor to submit a phasing schedule for approval by the Project <br /> Manager <br /> o Paint: <br /> ■ Prep and paint walls, ceilings, doors, and trim per spec in the Wall Finish Schedule <br /> ■ Two coats and primer where necessary <br /> ■ Patching, sanding and/or caulking as needed <br /> ■ Ensure surface is clean prior to painting <br /> ■ Excessive, non-repairable,damage to be reviewed on a case-by-case basis <br /> ■ Keep existing blinds on interior windows only; i.e., remove and reinstall as needed <br /> o Lighting/Electrical: <br /> ■ Furnish/install lighting per Reflected Ceiling Plan <br /> o Ceiling Tiles: <br /> ■ Remove and properly dispose of existing ACT <br /> ■ Furnish/install new ACT per Finish Schedule <br /> ■ Grid to remain—will discuss the need for repairs or painting on a case by case basis <br /> ■ Include removal of all ceiling HVAC vents, cleaning, repaint, and reinstall <br /> o Millwork: <br /> ■ Furnish/install new cabinetry and counters in the locations identified in the <br /> architectural plans per the millwork details. <br /> • Bathrooms(2) <br /> o Flooring: <br /> ■ Remove and properly dispose of existing flooring <br /> ■ Prep subfloor as needed and per manufacturers specifications <br /> ■ Furnish/install new flooring and base per the Floor Finish Plan <br /> ■ General Contractor to submit a phasing schedule for approval by the Project <br /> Manager <br /> o Paint: <br /> ■ Prep and paint walls, ceilings, doors, and trim per spec in the Wall Finish Schedule <br /> ■ Two coats and primer where necessary <br /> ■ Remove FRP and wall tile,where applicable <br /> ■ Patching, sanding and/or caulking as needed <br /> Effective Date:9/8/2022 <br />