Laserfiche WebLink
• • <br /> ■ Ensure surface is clean prior to painting <br /> ■ Excessive, non-repairable, damage to be reviewed on a case by case basis <br /> o Lighting/Electrical: <br /> ■ Furnish/install lighting per Reflected Ceiling Plan <br /> o Vanities and Fixtures: <br /> ■ Construct new ADA vanities per the millwork details within the architectural plans <br /> ■ Replace sink,faucets,vanity mirror,grab bar, and toilet paper holder per spec <br /> ■ Replace toilet to specification <br /> ■ General Contractor to provide new water supply lines, p-traps and ADA wraps <br /> ■ NOTE: Owner will furnish paper towel and soap dispensers—Specification pending <br /> • Laundry Rooms(2) <br /> o Flooring: <br /> ■ Remove and properly dispose of existing flooring <br /> ■ Prep subfloor as needed and per manufacturers specifications <br /> ■ Furnish/install new flooring and base per the Floor Finish Plan <br /> ■ Remove/re-install washers and dryers with new water supply hoses and hard <br /> exhaust vent ducting <br /> ■ General Contractor to submit a phasing schedule for approval by the Project <br /> Manager <br /> o Paint: <br /> ■ Prep and paint walls, ceilings, doors, counters,cabinets, and trim per spec in the <br /> Wall Finish Schedule <br /> ■ C-tops to be prepped and coated per specification <br /> ■ Two coats and primer where necessary <br /> ■ Patching, sanding and/or caulking as needed <br /> ■ Ensure surface is clean prior to painting <br /> ■ Excessive, non-repairable,damage to be reviewed on a case by case basis <br /> o Lighting/Electrical: <br /> ■ Furnish/install lighting per Reflected Ceiling Plan <br /> 2nd FLOOR <br /> • 2"d Floor Corridor <br /> o Flooring: <br /> ■ Remove and properly dispose of existing flooring <br /> ■ Prep subfloor as needed and per manufacturers specifications <br /> ■ Furnish/install new flooring and base per the Floor Finish Plan <br /> ■ Work is to be coordinated around high resident traffic hours <br /> ■ General Contractor to submit a phasing schedule for approval by the Project <br /> Manager <br /> o Paint: <br /> ■ Prep and paint walls, handrails, corridor side of doors,and trim/door casing per spec <br /> in the Wall Finish Schedule <br /> ■ Two coats and primer where necessary <br /> ■ Patching, sanding and/or caulking as needed <br /> Effective Date: 9/8/2022 <br /> 15 <br />