• • <br /> ■ Ensure surface is clean prior to painting <br /> ■ Excessive, non-repairable, damage to be reviewed on a case by case basis <br /> o Lighting: <br /> ■ Furnish/install lighting per Reflected Ceiling Plan <br /> o Ceiling Tiles: <br /> ■ Remove and properly dispose of existing ACT <br /> ■ Furnish/install new ACT per Finish Schedule <br /> ■ Grid to remain—will discuss the need for repairs or painting on a case by case basis <br /> ■ Account for removal and replacement of exit signs,WAPS, smoke detectors, etc. <br /> ■ Provide add/alt for exit sign replacement if condition warrants <br /> ■ Include removal of all ceiling HVAC vents, cleaning, repaint,and reinstall <br /> • Game Room/Pub <br /> o Flooring: <br /> ■ Remove and properly dispose of existing flooring <br /> ■ Prep subfloor as needed and per manufacturers specifications <br /> ■ Furnish/install new flooring and base per the Floor Finish Plan <br /> ■ Work is to be coordinated around high resident traffic hours <br /> ■ General Contractor to submit a phasing schedule for approval by the Project <br /> Manager <br /> o Paint: <br /> ■ Prep and paint walls, handrails, ceiling, and trim per spec in the Wall Finish Schedule <br /> ■ Two coats and primer where necessary <br /> ■ Patching, sanding and/or caulking as needed <br /> ■ Ensure surface is clean prior to painting <br /> ■ Excessive, non-repairable, damage to be reviewed on a case by case basis <br /> o Lighting/Electrical: <br /> ■ Furnish/install lighting per Reflected Ceiling Plan <br /> ■ Installation of low voltage items per the Power Plans by others <br /> o Millwork/Appliances/Fixtures: <br /> ■ Furnish/install decorative screens in the locations identified in the architectural <br /> plans per the millwork details <br /> ■ Furnish/install new cabinetry and counters in the locations identified in the <br /> architectural plans per the millwork details. <br /> • Connect plumbing fixtures per Plumbing Plan within the architectural <br /> drawings <br /> ■ Furnish/install appliances per spec schedule. <br /> • General Contractor to confirm identified appliances will fit within their <br /> respective locations per the dimensions listed in the millwork details <br /> o Provide in-wall blocking as needed and mount TV in location identified within the <br /> architectural plan <br /> o c Remove and dispose pool table, and shuffle board,game tables etc.. <br /> • Living Room/Library <br /> o Flooring: <br /> ■ Remove and properly dispose of existing flooring <br /> '1 ) 15 Effective Date: 9/8/2022 <br />