My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3915 COLBY AVE 2024-02-09
>
Address Records
>
COLBY AVE
>
3915
>
3915 COLBY AVE 2024-02-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2024 1:37:07 PM
Creation date
2/9/2024 1:36:44 PM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
3915
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br /> ■ Prep subfloor as needed and per manufacturers specifications <br /> ■ Furnish/install new flooring and base per the Floor Finish Plan <br /> ■ Work is to be coordinated around high resident traffic hours <br /> ■ General Contractor to submit a phasing schedule for approval by the Project <br /> Manager <br /> o Paint: <br /> ■ Prep and paint walls, ceiling, doors,and trim per spec in the Wall Finish Schedule <br /> ■ Two coats and primer where necessary <br /> ■ Patching, sanding and/or caulking as needed <br /> ■ Ensure surface is clean prior to painting <br /> ■ Excessive, non-repairable, damage to be reviewed on a case by case basis <br /> o Lighting/Electrical: <br /> ■ Furnish/install lighting per Reflected Ceiling Plan <br /> ■ Furnish/install low voltage items per the Power Plans <br /> o Provide in-wall blocking as needed and mount TV in location identified within the <br /> architectural plan <br /> • Fitness Center <br /> o Flooring: <br /> ■ Remove and properly dispose of existing flooring <br /> ■ Prep subfloor as needed and per manufacturers specifications <br /> ■ Furnish/install new flooring and base per the Floor Finish Plan <br /> ■ Work is to be coordinated around high resident traffic hours <br /> ■ General Contractor to submit a phasing schedule for approval by the Project <br /> Manager <br /> o Paint: <br /> ■ Prep and paint walls, ceiling, doors,and trim per spec in the Wall Finish Schedule <br /> ■ Two coats and primer where necessary <br /> ■ Patching, sanding and/or caulking as needed <br /> ■ Ensure surface is clean prior to painting <br /> ■ Excessive, non-repairable, damage to be reviewed on a case by case basis <br /> o Lighting/Electrical: <br /> ■ Furnish/install lighting per Reflected Ceiling Plan <br /> o Wall Construction: <br /> ■ Provide in-wall blocking and install mirrored wall with ballet bar per the <br /> architectural details(Add blocking for ballet barre as needed) <br /> o Provide in-wall blocking as needed and mount TV in location identified within the <br /> architectural plan <br /> • Business Center <br /> o Flooring: <br /> ■ Remove and properly dispose of existing flooring <br /> ■ Prep subfloor as needed and per manufacturers specifications <br /> ■ Furnish/install new flooring and base per the Floor Finish Plan <br /> ■ Work is to be coordinated around high resident traffic hours <br /> i 0' 1 Effective Date: 9/8/2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.